TurbinePayback

Wind Turbine Payback in Anderson County, SC

Wind turbine payback in Anderson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Anderson County, SC averages 3.24 m/s (7.2 mph). A 10 kW turbine there would make about 3,367 kWh a year, worth $535 at SC's 15.9¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Anderson County

A home turbine is not worth buying for savings in Anderson County unless your spot is far windier than the county average, 7.6 m/s at the hub against 3.24 m/s here. Per kW, solar panels would make about 1,340 kWh a year here against the turbine's 337, so get a solar quote first.

What would have to change

Against the rest of SC

Anderson County is the 2,831st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SC is Beaufort County at 5.71 m/s, payback 36 years.

Month by month in Anderson County

March is the strongest month here, at 3.75 m/s and about 458 kWh. August is the weakest, 2.50 m/s and 115 kWh, so the best month makes 4.0 times the worst. November to March brings in 53% of the year's output in Anderson County.

MonthWind at 30 mOutputWorth
January3.55 m/s384 kWh$61
February3.68 m/s389 kWh$62
March3.75 m/s458 kWh$73
April3.75 m/s443 kWh$70
May3.21 m/s276 kWh$44
June2.77 m/s163 kWh$26
July2.57 m/s127 kWh$20
August2.50 m/s115 kWh$18
September3.07 m/s230 kWh$37
October3.27 m/s295 kWh$47
November3.38 m/s319 kWh$51
December3.36 m/s322 kWh$51

What a taller tower would buy

Measured at 10 m the wind in Anderson County averages 2.09 m/s; at 50 m it is 3.97 m/s. That gives a shear exponent of 0.399, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,930 to 6,428 kWh a year, 233% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.75 m/s1,930 kWhover 100 years
30 m3.24 m/s3,360 kWhover 100 years
40 m3.63 m/s4,870 kWhover 100 years
50 m3.97 m/s6,428 kWh98 years

Counties around Anderson County

2 of the 6 closest counties are windier at turbine height; the windiest, Pickens County, averages 3.48 m/s.

Sun versus wind in Anderson County

Anderson County gets 4.59 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,340 kWh a year; one kW of the turbine above makes 337. Kilowatt for kilowatt, panels make 4.0 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.