No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Aroostook County, ME averages 3.9 m/s (8.7 mph). A 10 kW turbine there would make about 6,085 kWh a year, worth $1,840 at ME's 30.23¢/kWh. Against an installed cost of about $100,000, that is a payback of 54 years, and the turbine is built to last about 20.

What to do in Aroostook County

A home turbine is not worth buying for savings in Aroostook County unless your spot is far windier than the county average, 5.6 m/s at the hub against 3.9 m/s here. Per kW, solar panels would make about 1,013 kWh a year here against the turbine's 609, so get a solar quote first.

What would have to change

Against the rest of ME

Aroostook County is the 2,136th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ME is Knox County at 6.26 m/s, payback 15 years.

Month by month in Aroostook County

March is the strongest month here, at 4.55 m/s and about 816 kWh. July is the weakest, 3.24 m/s and 287 kWh, so the best month makes 2.8 times the worst. November to March brings in 54% of the year's output in Aroostook County.

MonthWind at 30 mOutputWorth
January4.33 m/s711 kWh$215
February4.59 m/s756 kWh$229
March4.55 m/s816 kWh$247
April4.30 m/s673 kWh$203
May3.70 m/s439 kWh$133
June3.45 m/s339 kWh$102
July3.24 m/s287 kWh$87
August3.28 m/s299 kWh$90
September3.55 m/s373 kWh$113
October3.82 m/s485 kWh$147
November3.98 m/s534 kWh$161
December4.09 m/s598 kWh$181

What a taller tower would buy

Measured at 10 m the wind in Aroostook County averages 2.5 m/s; at 50 m it is 4.8 m/s. That gives a shear exponent of 0.405, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 3,619 to 11,212 kWh a year, 210% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.31 m/s3,619 kWh91 years
30 m3.9 m/s6,099 kWh54 years
40 m4.39 m/s8,663 kWh38 years
50 m4.8 m/s11,212 kWh30 years

Counties around Aroostook County

3 of the 6 closest counties are windier at turbine height; the windiest, Hancock County, averages 4.76 m/s.

Sun versus wind in Aroostook County

Aroostook County gets 3.47 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,013 kWh a year; one kW of the turbine above makes 609. Kilowatt for kilowatt, panels make 1.7 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.