TurbinePayback

Wind Turbine Payback in Bell County, TX

Wind turbine payback in Bell County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Bell County, TX averages 5.61 m/s (12.5 mph). A 10 kW turbine there would make about 16,834 kWh a year, worth $2,699 at TX's 16.03¢/kWh. Against an installed cost of about $100,000, that is a payback of 37 years, and the turbine is built to last about 20.

What to do in Bell County

A home turbine is not worth buying for savings in Bell County unless your spot is far windier than the county average, 7.6 m/s at the hub against 5.61 m/s here. Per kW, solar panels would make about 1,405 kWh a year here against the turbine's 1,683, so get a solar quote first.

What would have to change

Against the rest of TX

Bell County is the 1,161st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TX is Dallam County at 6.82 m/s, payback 24 years.

Month by month in Bell County

April is the strongest month here, at 6.42 m/s and about 1,875 kWh. September is the weakest, 4.56 m/s and 798 kWh, so the best month makes 2.3 times the worst. November to March brings in 49% of the year's output in Bell County.

MonthWind at 30 mOutputWorth
January6.00 m/s1,676 kWh$269
February6.21 m/s1,630 kWh$261
March6.30 m/s1,866 kWh$299
April6.42 m/s1,875 kWh$301
May5.88 m/s1,598 kWh$256
June5.28 m/s1,188 kWh$190
July4.89 m/s1,001 kWh$160
August4.65 m/s871 kWh$140
September4.56 m/s798 kWh$128
October5.40 m/s1,302 kWh$209
November5.85 m/s1,530 kWh$245
December5.95 m/s1,643 kWh$263

What a taller tower would buy

Measured at 10 m the wind in Bell County averages 4.32 m/s; at 50 m it is 6.34 m/s. That gives a shear exponent of 0.238, typical of ordinary open country. Going from 20 m to 50 m takes output from 13,200 to 22,225 kWh a year, 68% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.1 m/s13,200 kWh47 years
30 m5.61 m/s16,865 kWh37 years
40 m6.01 m/s19,794 kWh32 years
50 m6.34 m/s22,225 kWh28 years

Counties around Bell County

3 of the 6 closest counties are windier at turbine height; the windiest, Burnet County, averages 5.75 m/s.

Sun versus wind in Bell County

Bell County gets 4.81 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,405 kWh a year; one kW of the turbine above makes 1,683. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.2 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.