Wind Turbine Payback in Big Stone County, MN

Wind turbine payback in Big Stone County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Big Stone County, MN averages 6.34 m/s (14.2 mph). A 10 kW turbine there would make about 22,225 kWh a year, worth $3,654 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 27 years, and the turbine is built to last about 20.

What to do in Big Stone County

A home turbine is not worth buying for savings in Big Stone County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.34 m/s here. Per kW, solar panels would make about 1,162 kWh a year here against the turbine's 2,223, so get a solar quote first.

What would have to change

Against the rest of MN

Big Stone County is the 420th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Big Stone County

April is the strongest month here, at 6.97 m/s and about 2,203 kWh. July is the weakest, 5.43 m/s and 1,320 kWh, so the best month makes 1.7 times the worst. November to March brings in 43% of the year's output in Big Stone County.

MonthWind at 30 mOutputWorth
January6.38 m/s1,915 kWh$315
February6.46 m/s1,770 kWh$291
March6.59 m/s2,044 kWh$336
April6.97 m/s2,203 kWh$362
May6.71 m/s2,117 kWh$348
June6.04 m/s1,645 kWh$270
July5.43 m/s1,320 kWh$217
August5.46 m/s1,337 kWh$220
September6.44 m/s1,886 kWh$310
October6.80 m/s2,172 kWh$357
November6.55 m/s1,951 kWh$321
December6.28 m/s1,853 kWh$305

What a taller tower would buy

Measured at 10 m the wind in Big Stone County averages 5.03 m/s; at 50 m it is 7.06 m/s. That gives a shear exponent of 0.211, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,365 to 27,471 kWh a year, 50% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.82 m/s18,365 kWh33 years
30 m6.34 m/s22,215 kWh27 years
40 m6.74 m/s25,132 kWh24 years
50 m7.06 m/s27,471 kWh22 years

Counties around Big Stone County

5 of the 6 closest counties are windier at turbine height; the windiest, Grant County, averages 6.71 m/s.

Sun versus wind in Big Stone County

Big Stone County gets 3.98 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,162 kWh a year; one kW of the turbine above makes 2,223. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.