Wind turbine payback in Bremer County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Bremer County, IA averages 6.21 m/s (13.9 mph). A 10 kW turbine there would make about 21,262 kWh a year, worth $3,094 at IA's 14.55¢/kWh. Against an installed cost of about $100,000, that is a payback of 32 years, and the turbine is built to last about 20.

What to do in Bremer County

A home turbine is not worth buying for savings in Bremer County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.21 m/s here. Per kW, solar panels would make about 1,174 kWh a year here against the turbine's 2,126, so get a solar quote first.

What would have to change

Against the rest of IA

Bremer County is the 576th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IA is Dickinson County at 6.59 m/s, payback 29 years.

Month by month in Bremer County

April is the strongest month here, at 7.13 m/s and about 2,301 kWh. August is the weakest, 4.87 m/s and 994 kWh, so the best month makes 2.3 times the worst. November to March brings in 47% of the year's output in Bremer County.

MonthWind at 30 mOutputWorth
January6.65 m/s2,082 kWh$303
February6.69 m/s1,901 kWh$277
March6.78 m/s2,160 kWh$314
April7.13 m/s2,301 kWh$335
May6.44 m/s1,949 kWh$284
June5.67 m/s1,419 kWh$206
July4.91 m/s1,014 kWh$148
August4.87 m/s994 kWh$145
September5.91 m/s1,565 kWh$228
October6.48 m/s1,977 kWh$288
November6.60 m/s1,983 kWh$289
December6.43 m/s1,943 kWh$283

What a taller tower would buy

Measured at 10 m the wind in Bremer County averages 4.87 m/s; at 50 m it is 6.96 m/s. That gives a shear exponent of 0.222, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,338 to 26,756 kWh a year, 54% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.68 m/s17,338 kWh40 years
30 m6.21 m/s21,290 kWh32 years
40 m6.62 m/s24,316 kWh28 years
50 m6.96 m/s26,756 kWh26 years

Counties around Bremer County

None of the 6 closest counties is windier than Bremer County.

Sun versus wind in Bremer County

Bremer County gets 4.02 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,174 kWh a year; one kW of the turbine above makes 2,126. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.