TurbinePayback

Wind Turbine Payback in Brown County, IN

Wind turbine payback in Brown County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Brown County, IN averages 4.32 m/s (9.7 mph). A 10 kW turbine there would make about 8,289 kWh a year, worth $1,412 at IN's 17.04¢/kWh. Against an installed cost of about $100,000, that is a payback of 71 years, and the turbine is built to last about 20.

What to do in Brown County

A home turbine is not worth buying for savings in Brown County unless your spot is far windier than the county average, 7.3 m/s at the hub against 4.32 m/s here. Per kW, solar panels would make about 1,168 kWh a year here against the turbine's 829, so get a solar quote first.

What would have to change

Against the rest of IN

Brown County is the 1,882nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IN is Lake County at 6.17 m/s, payback 28 years.

Month by month in Brown County

January is the strongest month here, at 5.04 m/s and about 1,088 kWh. July is the weakest, 3.23 m/s and 282 kWh, so the best month makes 3.9 times the worst. November to March brings in 56% of the year's output in Brown County.

MonthWind at 30 mOutputWorth
January5.04 m/s1,088 kWh$185
February5.04 m/s983 kWh$168
March5.03 m/s1,083 kWh$185
April5.08 m/s1,072 kWh$183
May4.21 m/s650 kWh$111
June3.65 m/s406 kWh$69
July3.23 m/s282 kWh$48
August3.23 m/s284 kWh$48
September3.66 m/s409 kWh$70
October4.32 m/s706 kWh$120
November4.64 m/s840 kWh$143
December4.74 m/s918 kWh$156

What a taller tower would buy

Measured at 10 m the wind in Brown County averages 3 m/s; at 50 m it is 5.11 m/s. That gives a shear exponent of 0.331, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 5,491 to 13,284 kWh a year, 142% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.77 m/s5,491 kWhover 100 years
30 m4.32 m/s8,261 kWh71 years
40 m4.75 m/s10,865 kWh54 years
50 m5.11 m/s13,284 kWh44 years

Counties around Brown County

3 of the 6 closest counties are windier at turbine height; the windiest, Johnson County, averages 5.09 m/s.

Sun versus wind in Brown County

Brown County gets 4 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,168 kWh a year; one kW of the turbine above makes 829. Kilowatt for kilowatt, panels make 1.4 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.