TurbinePayback

Wind Turbine Payback in Brown County, KS

Wind turbine payback in Brown County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Brown County, KS averages 6.2 m/s (13.9 mph). A 10 kW turbine there would make about 21,187 kWh a year, worth $3,233 at KS's 15.26¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Brown County

A home turbine is not worth buying for savings in Brown County unless your spot is far windier than the county average, 7.8 m/s at the hub against 6.2 m/s here. Per kW, solar panels would make about 1,256 kWh a year here against the turbine's 2,119, so get a solar quote first.

What would have to change

Against the rest of KS

Brown County is the 588th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in KS is Edwards County at 6.68 m/s, payback 27 years.

Month by month in Brown County

April is the strongest month here, at 7.10 m/s and about 2,280 kWh. August is the weakest, 4.92 m/s and 1,022 kWh, so the best month makes 2.2 times the worst. November to March brings in 47% of the year's output in Brown County.

MonthWind at 30 mOutputWorth
January6.49 m/s1,983 kWh$303
February6.47 m/s1,776 kWh$271
March6.84 m/s2,199 kWh$336
April7.10 m/s2,280 kWh$348
May6.28 m/s1,849 kWh$282
June5.90 m/s1,556 kWh$237
July5.05 m/s1,093 kWh$167
August4.92 m/s1,022 kWh$156
September5.88 m/s1,545 kWh$236
October6.46 m/s1,961 kWh$299
November6.68 m/s2,032 kWh$310
December6.39 m/s1,921 kWh$293

What a taller tower would buy

Measured at 10 m the wind in Brown County averages 4.83 m/s; at 50 m it is 6.96 m/s. That gives a shear exponent of 0.227, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,148 to 26,756 kWh a year, 56% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.65 m/s17,148 kWh38 years
30 m6.2 m/s21,172 kWh31 years
40 m6.62 m/s24,261 kWh27 years
50 m6.96 m/s26,756 kWh25 years

Counties around Brown County

1 of the 6 closest counties is windier at turbine height; the windiest, Nemaha County, averages 6.34 m/s.

Sun versus wind in Brown County

Brown County gets 4.3 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,256 kWh a year; one kW of the turbine above makes 2,119. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.