Wind Turbine Payback in Cedar County, MO

Wind turbine payback in Cedar County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Cedar County, MO averages 5.73 m/s (12.8 mph). A 10 kW turbine there would make about 17,712 kWh a year, worth $2,529 at MO's 14.28¢/kWh. Against an installed cost of about $100,000, that is a payback of 40 years, and the turbine is built to last about 20.

What to do in Cedar County

A home turbine is not worth buying for savings in Cedar County unless your spot is far windier than the county average, 8.2 m/s at the hub against 5.73 m/s here. Per kW, solar panels would make about 1,267 kWh a year here against the turbine's 1,771, so get a solar quote first.

What would have to change

Against the rest of MO

Cedar County is the 1,121st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MO is Atchison County at 6.17 m/s, payback 33 years.

Month by month in Cedar County

April is the strongest month here, at 6.71 m/s and about 2,050 kWh. July is the weakest, 4.45 m/s and 768 kWh, so the best month makes 2.7 times the worst. November to March brings in 50% of the year's output in Cedar County.

MonthWind at 30 mOutputWorth
January6.17 m/s1,781 kWh$254
February6.28 m/s1,669 kWh$238
March6.53 m/s2,009 kWh$287
April6.71 m/s2,050 kWh$293
May5.76 m/s1,520 kWh$217
June5.19 m/s1,138 kWh$163
July4.45 m/s768 kWh$110
August4.52 m/s803 kWh$115
September4.95 m/s1,004 kWh$143
October5.88 m/s1,598 kWh$228
November6.27 m/s1,783 kWh$255
December6.09 m/s1,731 kWh$247

What a taller tower would buy

Measured at 10 m the wind in Cedar County averages 4.38 m/s; at 50 m it is 6.49 m/s. That gives a shear exponent of 0.244, typical of ordinary open country. Going from 20 m to 50 m takes output from 13,835 to 23,333 kWh a year, 69% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.19 m/s13,835 kWh51 years
30 m5.73 m/s17,708 kWh40 years
40 m6.15 m/s20,787 kWh34 years
50 m6.49 m/s23,333 kWh30 years

Counties around Cedar County

2 of the 6 closest counties are windier at turbine height; the windiest, Barton County, averages 5.91 m/s.

Sun versus wind in Cedar County

Cedar County gets 4.34 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,267 kWh a year; one kW of the turbine above makes 1,771. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.