TurbinePayback

Wind Turbine Payback in Cerro Gordo County, IA

Wind turbine payback in Cerro Gordo County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Cerro Gordo County, IA averages 6.33 m/s (14.2 mph). A 10 kW turbine there would make about 22,151 kWh a year, worth $3,223 at IA's 14.55¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Cerro Gordo County

A home turbine is not worth buying for savings in Cerro Gordo County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.33 m/s here. Per kW, solar panels would make about 1,159 kWh a year here against the turbine's 2,215, so get a solar quote first.

What would have to change

Against the rest of IA

Cerro Gordo County is the 441st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IA is Dickinson County at 6.59 m/s, payback 29 years.

Month by month in Cerro Gordo County

April is the strongest month here, at 7.24 m/s and about 2,362 kWh. August is the weakest, 4.97 m/s and 1,047 kWh, so the best month makes 2.3 times the worst. November to March brings in 47% of the year's output in Cerro Gordo County.

MonthWind at 30 mOutputWorth
January6.80 m/s2,175 kWh$316
February6.78 m/s1,955 kWh$284
March6.89 m/s2,230 kWh$324
April7.24 m/s2,362 kWh$344
May6.56 m/s2,025 kWh$295
June5.80 m/s1,498 kWh$218
July5.00 m/s1,067 kWh$155
August4.97 m/s1,047 kWh$152
September6.03 m/s1,639 kWh$238
October6.58 m/s2,037 kWh$296
November6.75 m/s2,073 kWh$302
December6.60 m/s2,053 kWh$299

What a taller tower would buy

Measured at 10 m the wind in Cerro Gordo County averages 4.97 m/s; at 50 m it is 7.08 m/s. That gives a shear exponent of 0.220, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,134 to 27,613 kWh a year, 52% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.79 m/s18,134 kWh38 years
30 m6.33 m/s22,132 kWh31 years
40 m6.74 m/s25,172 kWh27 years
50 m7.08 m/s27,613 kWh25 years

Counties around Cerro Gordo County

4 of the 6 closest counties are windier at turbine height; the windiest, Winnebago County, averages 6.47 m/s.

Sun versus wind in Cerro Gordo County

Cerro Gordo County gets 3.97 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,159 kWh a year; one kW of the turbine above makes 2,215. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.