Wind turbine payback in Cheyenne County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Cheyenne County, NE averages 6.17 m/s (13.8 mph). A 10 kW turbine there would make about 20,965 kWh a year, worth $2,709 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 37 years, and the turbine is built to last about 20.

What to do in Cheyenne County

A home turbine is not worth buying for savings in Cheyenne County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.17 m/s here. Per kW, solar panels would make about 1,352 kWh a year here against the turbine's 2,097, so get a solar quote first.

What would have to change

Against the rest of NE

Cheyenne County is the 608th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Cheyenne County

January is the strongest month here, at 6.87 m/s and about 2,220 kWh. July is the weakest, 5.13 m/s and 1,140 kWh, so the best month makes 1.9 times the worst. November to March brings in 49% of the year's output in Cheyenne County.

MonthWind at 30 mOutputWorth
January6.87 m/s2,220 kWh$287
February6.68 m/s1,896 kWh$245
March6.70 m/s2,111 kWh$273
April6.73 m/s2,064 kWh$267
May5.98 m/s1,658 kWh$214
June5.56 m/s1,352 kWh$175
July5.13 m/s1,140 kWh$147
August5.18 m/s1,171 kWh$151
September5.64 m/s1,400 kWh$181
October6.35 m/s1,893 kWh$245
November6.59 m/s1,978 kWh$256
December6.74 m/s2,138 kWh$276

What a taller tower would buy

Measured at 10 m the wind in Cheyenne County averages 4.81 m/s; at 50 m it is 6.93 m/s. That gives a shear exponent of 0.227, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,970 to 26,541 kWh a year, 56% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.63 m/s16,970 kWh46 years
30 m6.17 m/s20,974 kWh37 years
40 m6.59 m/s24,052 kWh32 years
50 m6.93 m/s26,541 kWh29 years

Counties around Cheyenne County

4 of the 6 closest counties are windier at turbine height; the windiest, Banner County, averages 6.44 m/s.

Sun versus wind in Cheyenne County

Cheyenne County gets 4.63 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,352 kWh a year; one kW of the turbine above makes 2,097. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.6 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.