Wind Turbine Payback in Chippewa County, WI

Wind turbine payback in Chippewa County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Chippewa County, WI averages 5.9 m/s (13.2 mph). A 10 kW turbine there would make about 18,964 kWh a year, worth $3,613 at WI's 19.05¢/kWh. Against an installed cost of about $100,000, that is a payback of 28 years, and the turbine is built to last about 20.

What to do in Chippewa County

A home turbine is not worth buying for savings in Chippewa County unless your spot is far windier than the county average, 6.9 m/s at the hub against 5.9 m/s here. Per kW, solar panels would make about 1,092 kWh a year here against the turbine's 1,896, so get a solar quote first.

What would have to change

Against the rest of WI

Chippewa County is the 988th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WI is Manitowoc County at 7.32 m/s, payback 18 years.

Month by month in Chippewa County

April is the strongest month here, at 6.57 m/s and about 1,964 kWh. July is the weakest, 4.96 m/s and 1,043 kWh, so the best month makes 1.9 times the worst. November to March brings in 46% of the year's output in Chippewa County.

MonthWind at 30 mOutputWorth
January6.17 m/s1,783 kWh$340
February6.41 m/s1,742 kWh$332
March6.25 m/s1,834 kWh$349
April6.57 m/s1,964 kWh$374
May6.00 m/s1,671 kWh$318
June5.51 m/s1,322 kWh$252
July4.96 m/s1,043 kWh$199
August5.02 m/s1,074 kWh$205
September5.80 m/s1,498 kWh$285
October6.19 m/s1,795 kWh$342
November6.11 m/s1,688 kWh$322
December5.92 m/s1,621 kWh$309

What a taller tower would buy

Measured at 10 m the wind in Chippewa County averages 4.6 m/s; at 50 m it is 6.62 m/s. That gives a shear exponent of 0.226, typical of ordinary open country. Going from 20 m to 50 m takes output from 15,189 to 24,289 kWh a year, 60% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.38 m/s15,189 kWh35 years
30 m5.9 m/s18,951 kWh28 years
40 m6.29 m/s21,887 kWh24 years
50 m6.62 m/s24,289 kWh22 years

Counties around Chippewa County

5 of the 6 closest counties are windier at turbine height; the windiest, Barron County, averages 6.03 m/s.

Sun versus wind in Chippewa County

Chippewa County gets 3.74 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,092 kWh a year; one kW of the turbine above makes 1,896. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.