TurbinePayback

Wind Turbine Payback in Clallam County, WA

Wind turbine payback in Clallam County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Clallam County, WA averages 3.01 m/s (6.7 mph). A 10 kW turbine there would make about 2,631 kWh a year, worth $379 at WA's 14.42¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Clallam County

A home turbine is not worth buying for savings in Clallam County unless your spot is far windier than the county average, 8.1 m/s at the hub against 3.01 m/s here. Per kW, solar panels would make about 1,016 kWh a year here against the turbine's 263, so get a solar quote first.

What would have to change

Against the rest of WA

Clallam County is the 3,056th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WA is Columbia County at 5.18 m/s, payback 50 years.

Month by month in Clallam County

January is the strongest month here, at 3.83 m/s and about 489 kWh. August is the weakest, 2.12 m/s and 58 kWh, so the best month makes 8.4 times the worst. November to March brings in 70% of the year's output in Clallam County.

MonthWind at 30 mOutputWorth
January3.83 m/s489 kWh$71
February3.42 m/s308 kWh$44
March3.57 m/s390 kWh$56
April3.03 m/s220 kWh$32
May2.47 m/s109 kWh$16
June2.45 m/s103 kWh$15
July2.17 m/s64 kWh$9
August2.12 m/s58 kWh$8
September2.47 m/s106 kWh$15
October3.12 m/s252 kWh$36
November3.77 m/s451 kWh$65
December3.79 m/s472 kWh$68

What a taller tower would buy

Measured at 10 m the wind in Clallam County averages 2.16 m/s; at 50 m it is 3.51 m/s. That gives a shear exponent of 0.302, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,706 to 4,368 kWh a year, 156% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.66 m/s1,706 kWhover 100 years
30 m3.01 m/s2,625 kWhover 100 years
40 m3.28 m/s3,510 kWhover 100 years
50 m3.51 m/s4,368 kWhover 100 years

Counties around Clallam County

2 of the 6 closest counties are windier at turbine height; the windiest, San Juan County, averages 3.83 m/s.

Sun versus wind in Clallam County

Clallam County gets 3.48 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,016 kWh a year; one kW of the turbine above makes 263. Kilowatt for kilowatt, panels make 3.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.