Wind Turbine Payback in Clark County, OH

Wind turbine payback in Clark County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Clark County, OH averages 5.76 m/s (12.9 mph). A 10 kW turbine there would make about 17,932 kWh a year, worth $3,373 at OH's 18.81¢/kWh. Against an installed cost of about $100,000, that is a payback of 30 years, and the turbine is built to last about 20.

What to do in Clark County

A home turbine is not worth buying for savings in Clark County unless your spot is far windier than the county average, 6.9 m/s at the hub against 5.76 m/s here. Per kW, solar panels would make about 1,165 kWh a year here against the turbine's 1,793, so get a solar quote first.

What would have to change

Against the rest of OH

Clark County is the 1,103rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in OH is Lake County at 6.53 m/s, payback 23 years.

Month by month in Clark County

January is the strongest month here, at 6.72 m/s and about 2,127 kWh. August is the weakest, 4.26 m/s and 677 kWh, so the best month makes 3.1 times the worst. November to March brings in 54% of the year's output in Clark County.

MonthWind at 30 mOutputWorth
January6.72 m/s2,127 kWh$400
February6.58 m/s1,842 kWh$346
March6.51 m/s1,995 kWh$375
April6.66 m/s2,022 kWh$380
May5.60 m/s1,427 kWh$268
June4.99 m/s1,026 kWh$193
July4.28 m/s686 kWh$129
August4.26 m/s677 kWh$127
September4.81 m/s924 kWh$174
October5.90 m/s1,609 kWh$303
November6.36 m/s1,839 kWh$346
December6.42 m/s1,939 kWh$365

What a taller tower would buy

Measured at 10 m the wind in Clark County averages 4.46 m/s; at 50 m it is 6.48 m/s. That gives a shear exponent of 0.232, typical of ordinary open country. Going from 20 m to 50 m takes output from 14,180 to 23,260 kWh a year, 64% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.24 m/s14,180 kWh38 years
30 m5.76 m/s17,901 kWh30 years
40 m6.15 m/s20,839 kWh26 years
50 m6.48 m/s23,260 kWh23 years

Counties around Clark County

2 of the 6 closest counties are windier at turbine height; the windiest, Miami County, averages 5.77 m/s.

Sun versus wind in Clark County

Clark County gets 3.99 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,165 kWh a year; one kW of the turbine above makes 1,793. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.5 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.