TurbinePayback

Wind Turbine Payback in Clarke County, VA

Wind turbine payback in Clarke County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Clarke County, VA averages 3.48 m/s (7.8 mph). A 10 kW turbine there would make about 4,250 kWh a year, worth $720 at VA's 16.95¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Clarke County

A home turbine is not worth buying for savings in Clarke County unless your spot is far windier than the county average, 7.3 m/s at the hub against 3.48 m/s here. Per kW, solar panels would make about 1,162 kWh a year here against the turbine's 425, so get a solar quote first.

What would have to change

Against the rest of VA

Clarke County is the 2,536th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in VA is Northampton County at 7.01 m/s, payback 22 years.

Month by month in Clarke County

March is the strongest month here, at 4.15 m/s and about 626 kWh. August is the weakest, 2.63 m/s and 139 kWh, so the best month makes 4.5 times the worst. November to March brings in 60% of the year's output in Clarke County.

MonthWind at 30 mOutputWorth
January4.11 m/s608 kWh$103
February4.23 m/s596 kWh$101
March4.15 m/s626 kWh$106
April3.94 m/s514 kWh$87
May3.26 m/s291 kWh$49
June2.98 m/s208 kWh$35
July2.69 m/s150 kWh$25
August2.63 m/s139 kWh$24
September2.95 m/s202 kWh$34
October3.40 m/s333 kWh$56
November3.66 m/s411 kWh$70
December3.77 m/s464 kWh$79

What a taller tower would buy

Measured at 10 m the wind in Clarke County averages 2.19 m/s; at 50 m it is 4.31 m/s. That gives a shear exponent of 0.421, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,400 to 8,233 kWh a year, 243% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.93 m/s2,400 kWhover 100 years
30 m3.48 m/s4,234 kWhover 100 years
40 m3.92 m/s6,199 kWh95 years
50 m4.31 m/s8,233 kWh72 years

Counties around Clarke County

3 of the 6 closest counties are windier at turbine height; the windiest, Loudoun County, averages 4.57 m/s.

Sun versus wind in Clarke County

Clarke County gets 3.98 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,162 kWh a year; one kW of the turbine above makes 425. Kilowatt for kilowatt, panels make 2.7 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.