TurbinePayback

Wind Turbine Payback in Coshocton County, OH

Wind turbine payback in Coshocton County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Coshocton County, OH averages 4.14 m/s (9.3 mph). A 10 kW turbine there would make about 7,301 kWh a year, worth $1,373 at OH's 18.81¢/kWh. Against an installed cost of about $100,000, that is a payback of 73 years, and the turbine is built to last about 20.

What to do in Coshocton County

A home turbine is not worth buying for savings in Coshocton County unless your spot is far windier than the county average, 6.9 m/s at the hub against 4.14 m/s here. Per kW, solar panels would make about 1,110 kWh a year here against the turbine's 730, so get a solar quote first.

What would have to change

Against the rest of OH

Coshocton County is the 1,975th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in OH is Lake County at 6.53 m/s, payback 23 years.

Month by month in Coshocton County

January is the strongest month here, at 4.92 m/s and about 1,020 kWh. August is the weakest, 3.14 m/s and 259 kWh, so the best month makes 3.9 times the worst. November to March brings in 57% of the year's output in Coshocton County.

MonthWind at 30 mOutputWorth
January4.92 m/s1,020 kWh$192
February4.91 m/s917 kWh$172
March4.78 m/s941 kWh$177
April4.75 m/s893 kWh$168
May3.92 m/s525 kWh$99
June3.56 m/s376 kWh$71
July3.17 m/s266 kWh$50
August3.14 m/s259 kWh$49
September3.45 m/s341 kWh$64
October4.13 m/s615 kWh$116
November4.41 m/s725 kWh$136
December4.53 m/s808 kWh$152

What a taller tower would buy

Measured at 10 m the wind in Coshocton County averages 2.8 m/s; at 50 m it is 4.96 m/s. That gives a shear exponent of 0.355, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 4,664 to 12,266 kWh a year, 163% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.58 m/s4,664 kWhover 100 years
30 m4.14 m/s7,287 kWh73 years
40 m4.58 m/s9,838 kWh54 years
50 m4.96 m/s12,266 kWh43 years

Counties around Coshocton County

2 of the 6 closest counties are windier at turbine height; the windiest, Knox County, averages 4.84 m/s.

Sun versus wind in Coshocton County

Coshocton County gets 3.8 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,110 kWh a year; one kW of the turbine above makes 730. Kilowatt for kilowatt, panels make 1.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.