TurbinePayback

Wind Turbine Payback in Cowlitz County, WA

Wind turbine payback in Cowlitz County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Cowlitz County, WA averages 2.96 m/s (6.6 mph). A 10 kW turbine there would make about 2,484 kWh a year, worth $358 at WA's 14.42¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Cowlitz County

A home turbine is not worth buying for savings in Cowlitz County unless your spot is far windier than the county average, 8.1 m/s at the hub against 2.96 m/s here. Per kW, solar panels would make about 1,013 kWh a year here against the turbine's 248, so get a solar quote first.

What would have to change

Against the rest of WA

Cowlitz County is the 3,076th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WA is Columbia County at 5.18 m/s, payback 50 years.

Month by month in Cowlitz County

January is the strongest month here, at 3.71 m/s and about 444 kWh. August is the weakest, 2.45 m/s and 106 kWh, so the best month makes 4.2 times the worst. November to March brings in 64% of the year's output in Cowlitz County.

MonthWind at 30 mOutputWorth
January3.71 m/s444 kWh$64
February3.31 m/s277 kWh$40
March3.08 m/s243 kWh$35
April2.78 m/s163 kWh$24
May2.53 m/s119 kWh$17
June2.52 m/s114 kWh$16
July2.49 m/s114 kWh$16
August2.45 m/s106 kWh$15
September2.65 m/s138 kWh$20
October3.00 m/s222 kWh$32
November3.47 m/s347 kWh$50
December3.61 m/s405 kWh$58

What a taller tower would buy

Measured at 10 m the wind in Cowlitz County averages 1.87 m/s; at 50 m it is 3.67 m/s. That gives a shear exponent of 0.419, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,351 to 5,034 kWh a year, 273% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.5 m/s1,351 kWhover 100 years
30 m2.96 m/s2,492 kWhover 100 years
40 m3.34 m/s3,729 kWhover 100 years
50 m3.67 m/s5,034 kWhover 100 years

Counties around Cowlitz County

3 of the 6 closest counties are windier at turbine height; the windiest, Multnomah County, averages 3.39 m/s.

Sun versus wind in Cowlitz County

Cowlitz County gets 3.47 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,013 kWh a year; one kW of the turbine above makes 248. Kilowatt for kilowatt, panels make 4.1 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.