Wind Turbine Payback in Crawford County, AR

Wind turbine payback in Crawford County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Crawford County, AR averages 4.28 m/s (9.6 mph). A 10 kW turbine there would make about 8,064 kWh a year, worth $1,108 at AR's 13.74¢/kWh. Against an installed cost of about $100,000, that is a payback of 90 years, and the turbine is built to last about 20.

What to do in Crawford County

A home turbine is not worth buying for savings in Crawford County unless your spot is far windier than the county average, 8.4 m/s at the hub against 4.28 m/s here. Per kW, solar panels would make about 1,296 kWh a year here against the turbine's 806, so get a solar quote first.

What would have to change

Against the rest of AR

Crawford County is the 1,903rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AR is Mississippi County at 5.35 m/s, payback 49 years.

Month by month in Crawford County

April is the strongest month here, at 5.08 m/s and about 1,075 kWh. July is the weakest, 3.25 m/s and 290 kWh, so the best month makes 3.7 times the worst. November to March brings in 52% of the year's output in Crawford County.

MonthWind at 30 mOutputWorth
January4.63 m/s862 kWh$118
February4.80 m/s858 kWh$118
March5.01 m/s1,071 kWh$147
April5.08 m/s1,075 kWh$148
May4.37 m/s730 kWh$100
June3.80 m/s460 kWh$63
July3.25 m/s290 kWh$40
August3.31 m/s308 kWh$42
September3.77 m/s451 kWh$62
October4.28 m/s684 kWh$94
November4.60 m/s816 kWh$112
December4.49 m/s786 kWh$108

What a taller tower would buy

Measured at 10 m the wind in Crawford County averages 3.1 m/s; at 50 m it is 4.97 m/s. That gives a shear exponent of 0.293, typical of ordinary open country. Going from 20 m to 50 m takes output from 5,613 to 12,333 kWh a year, 120% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.8 m/s5,613 kWhover 100 years
30 m4.28 m/s8,059 kWh90 years
40 m4.66 m/s10,291 kWh71 years
50 m4.97 m/s12,333 kWh59 years

Counties around Crawford County

1 of the 6 closest counties is windier at turbine height; the windiest, Sequoyah County, averages 4.62 m/s.

Sun versus wind in Crawford County

Crawford County gets 4.44 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,296 kWh a year; one kW of the turbine above makes 806. Kilowatt for kilowatt, panels make 1.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.