Wind Turbine Payback in Cumberland County, IL

Wind turbine payback in Cumberland County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Cumberland County, IL averages 5.91 m/s (13.2 mph). A 10 kW turbine there would make about 19,038 kWh a year, worth $3,661 at IL's 19.23¢/kWh. Against an installed cost of about $100,000, that is a payback of 27 years, and the turbine is built to last about 20.

What to do in Cumberland County

A home turbine is not worth buying for savings in Cumberland County unless your spot is far windier than the county average, 6.8 m/s at the hub against 5.91 m/s here. Per kW, solar panels would make about 1,188 kWh a year here against the turbine's 1,904, so get a solar quote first.

What would have to change

Against the rest of IL

Cumberland County is the 978th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IL is Cook County at 6.73 m/s, payback 21 years.

Month by month in Cumberland County

April is the strongest month here, at 6.97 m/s and about 2,205 kWh. July is the weakest, 4.44 m/s and 762 kWh, so the best month makes 2.9 times the worst. November to March brings in 52% of the year's output in Cumberland County.

MonthWind at 30 mOutputWorth
January6.62 m/s2,065 kWh$397
February6.59 m/s1,845 kWh$355
March6.68 m/s2,098 kWh$403
April6.97 m/s2,205 kWh$424
May5.96 m/s1,646 kWh$317
June5.17 m/s1,124 kWh$216
July4.44 m/s762 kWh$147
August4.46 m/s771 kWh$148
September5.02 m/s1,044 kWh$201
October6.13 m/s1,753 kWh$337
November6.56 m/s1,961 kWh$377
December6.40 m/s1,926 kWh$370

What a taller tower would buy

Measured at 10 m the wind in Cumberland County averages 4.58 m/s; at 50 m it is 6.66 m/s. That gives a shear exponent of 0.233, typical of ordinary open country. Going from 20 m to 50 m takes output from 15,174 to 24,582 kWh a year, 62% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.38 m/s15,174 kWh34 years
30 m5.91 m/s19,058 kWh27 years
40 m6.32 m/s22,096 kWh24 years
50 m6.66 m/s24,582 kWh21 years

Counties around Cumberland County

1 of the 6 closest counties is windier at turbine height; the windiest, Shelby County, averages 5.95 m/s.

Sun versus wind in Cumberland County

Cumberland County gets 4.07 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,188 kWh a year; one kW of the turbine above makes 1,904. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.6 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.