Wind turbine payback in Dewey County
No. The turbine wears out before it pays for itself.
At 30 m, the height a home turbine tower usually reaches, the wind in Dewey County, SD averages 6.39 m/s (14.3 mph). A 10 kW turbine there would make about 22,595 kWh a year, worth $3,294 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 30 years, and the turbine is built to last about 20.
What to do in Dewey County
A home turbine is not worth buying for savings in Dewey County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.39 m/s here. Per kW, solar panels would make about 1,206 kWh a year here against the turbine's 2,260, so get a solar quote first.
What would have to change
- Power would have to cost 22¢/kWh, 1.5 times what SD pays now.
- Or the average wind at the hub would have to be 8.1 m/s instead of 6.39. A taller tower or an exposed ridge can add some of that; a rooftop never will.
Against the rest of SD
Dewey County is the 347th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.
Month by month in Dewey County
October is the strongest month here, at 6.86 m/s and about 2,212 kWh. July is the weakest, 5.74 m/s and 1,512 kWh, so the best month makes 1.5 times the worst. November to March brings in 42% of the year's output in Dewey County.
| Month | Wind at 30 m | Output | Worth |
|---|---|---|---|
| January | 6.50 m/s | 1,988 kWh | $290 |
| February | 6.17 m/s | 1,606 kWh | $234 |
| March | 6.64 m/s | 2,078 kWh | $303 |
| April | 6.91 m/s | 2,167 kWh | $316 |
| May | 6.66 m/s | 2,089 kWh | $305 |
| June | 6.10 m/s | 1,682 kWh | $245 |
| July | 5.74 m/s | 1,512 kWh | $220 |
| August | 5.76 m/s | 1,523 kWh | $222 |
| September | 6.49 m/s | 1,918 kWh | $280 |
| October | 6.86 m/s | 2,212 kWh | $323 |
| November | 6.48 m/s | 1,913 kWh | $279 |
| December | 6.38 m/s | 1,914 kWh | $279 |
What a taller tower would buy
Measured at 10 m the wind in Dewey County averages 5.11 m/s; at 50 m it is 7.09 m/s. That gives a shear exponent of 0.203, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,865 to 27,684 kWh a year, 47% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.
| Hub height | Average wind | Output | Payback |
|---|---|---|---|
| 20 m | 5.89 m/s | 18,865 kWh | 36 years |
| 30 m | 6.39 m/s | 22,607 kWh | 30 years |
| 40 m | 6.78 m/s | 25,428 kWh | 27 years |
| 50 m | 7.09 m/s | 27,684 kWh | 25 years |
Counties around Dewey County
4 of the 6 closest counties are windier at turbine height; the windiest, Corson County, averages 6.52 m/s.
- Corson County, SD: 6.52 m/s, 23,554 kWh, payback 29 years (41 mi)
- Ziebach County, SD: 6.41 m/s, 22,743 kWh, payback 30 years (42 mi)
- Potter County, SD: 6.43 m/s, 22,891 kWh, payback 30 years (43 mi)
- Walworth County, SD: 6.51 m/s, 23,481 kWh, payback 29 years (44 mi)
- Sully County, SD: 6.35 m/s, 22,299 kWh, payback 31 years (45 mi)
- Stanley County, SD: 6.31 m/s, 22,003 kWh, payback 31 years (51 mi)
Sun versus wind in Dewey County
Dewey County gets 4.13 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,206 kWh a year; one kW of the turbine above makes 2,260. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.
How this is worked out
Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.