TurbinePayback

Wind Turbine Payback in Dewey County, SD

Wind turbine payback in Dewey County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Dewey County, SD averages 6.39 m/s (14.3 mph). A 10 kW turbine there would make about 22,595 kWh a year, worth $3,294 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 30 years, and the turbine is built to last about 20.

What to do in Dewey County

A home turbine is not worth buying for savings in Dewey County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.39 m/s here. Per kW, solar panels would make about 1,206 kWh a year here against the turbine's 2,260, so get a solar quote first.

What would have to change

Against the rest of SD

Dewey County is the 347th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Dewey County

October is the strongest month here, at 6.86 m/s and about 2,212 kWh. July is the weakest, 5.74 m/s and 1,512 kWh, so the best month makes 1.5 times the worst. November to March brings in 42% of the year's output in Dewey County.

MonthWind at 30 mOutputWorth
January6.50 m/s1,988 kWh$290
February6.17 m/s1,606 kWh$234
March6.64 m/s2,078 kWh$303
April6.91 m/s2,167 kWh$316
May6.66 m/s2,089 kWh$305
June6.10 m/s1,682 kWh$245
July5.74 m/s1,512 kWh$220
August5.76 m/s1,523 kWh$222
September6.49 m/s1,918 kWh$280
October6.86 m/s2,212 kWh$323
November6.48 m/s1,913 kWh$279
December6.38 m/s1,914 kWh$279

What a taller tower would buy

Measured at 10 m the wind in Dewey County averages 5.11 m/s; at 50 m it is 7.09 m/s. That gives a shear exponent of 0.203, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,865 to 27,684 kWh a year, 47% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.89 m/s18,865 kWh36 years
30 m6.39 m/s22,607 kWh30 years
40 m6.78 m/s25,428 kWh27 years
50 m7.09 m/s27,684 kWh25 years

Counties around Dewey County

4 of the 6 closest counties are windier at turbine height; the windiest, Corson County, averages 6.52 m/s.

Sun versus wind in Dewey County

Dewey County gets 4.13 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,206 kWh a year; one kW of the turbine above makes 2,260. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.