TurbinePayback

Wind Turbine Payback in Dixon County, NE

Wind turbine payback in Dixon County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Dixon County, NE averages 6.52 m/s (14.6 mph). A 10 kW turbine there would make about 23,554 kWh a year, worth $3,043 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 33 years, and the turbine is built to last about 20.

What to do in Dixon County

A home turbine is not worth buying for savings in Dixon County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.52 m/s here. Per kW, solar panels would make about 1,215 kWh a year here against the turbine's 2,355, so get a solar quote first.

What would have to change

Against the rest of NE

Dixon County is the 180th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Dixon County

April is the strongest month here, at 7.28 m/s and about 2,385 kWh. July is the weakest, 5.41 m/s and 1,310 kWh, so the best month makes 1.8 times the worst. November to March brings in 45% of the year's output in Dixon County.

MonthWind at 30 mOutputWorth
January6.80 m/s2,177 kWh$281
February6.76 m/s1,941 kWh$251
March6.95 m/s2,265 kWh$293
April7.28 m/s2,385 kWh$308
May6.70 m/s2,110 kWh$273
June6.11 m/s1,689 kWh$218
July5.41 m/s1,310 kWh$169
August5.42 m/s1,315 kWh$170
September6.53 m/s1,940 kWh$251
October6.82 m/s2,188 kWh$283
November6.86 m/s2,139 kWh$276
December6.64 m/s2,077 kWh$268

What a taller tower would buy

Measured at 10 m the wind in Dixon County averages 5.15 m/s; at 50 m it is 7.27 m/s. That gives a shear exponent of 0.214, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,523 to 28,951 kWh a year, 48% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.98 m/s19,523 kWh40 years
30 m6.52 m/s23,533 kWh33 years
40 m6.93 m/s26,548 kWh29 years
50 m7.27 m/s28,951 kWh27 years

Counties around Dixon County

2 of the 6 closest counties are windier at turbine height; the windiest, Cedar County, averages 6.66 m/s.

Sun versus wind in Dixon County

Dixon County gets 4.16 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,215 kWh a year; one kW of the turbine above makes 2,355. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.