TurbinePayback

Wind Turbine Payback in Dorchester County, SC

Wind turbine payback in Dorchester County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Dorchester County, SC averages 4.05 m/s (9.1 mph). A 10 kW turbine there would make about 6,831 kWh a year, worth $1,086 at SC's 15.9¢/kWh. Against an installed cost of about $100,000, that is a payback of 92 years, and the turbine is built to last about 20.

What to do in Dorchester County

A home turbine is not worth buying for savings in Dorchester County unless your spot is far windier than the county average, 7.6 m/s at the hub against 4.05 m/s here. Per kW, solar panels would make about 1,355 kWh a year here against the turbine's 683, so get a solar quote first.

What would have to change

Against the rest of SC

Dorchester County is the 2,027th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SC is Beaufort County at 5.71 m/s, payback 36 years.

Month by month in Dorchester County

March is the strongest month here, at 4.60 m/s and about 844 kWh. August is the weakest, 3.31 m/s and 307 kWh, so the best month makes 2.7 times the worst. November to March brings in 50% of the year's output in Dorchester County.

MonthWind at 30 mOutputWorth
January4.35 m/s721 kWh$115
February4.46 m/s696 kWh$111
March4.60 m/s844 kWh$134
April4.61 m/s821 kWh$131
May4.17 m/s633 kWh$101
June3.64 m/s403 kWh$64
July3.49 m/s363 kWh$58
August3.31 m/s307 kWh$49
September3.81 m/s464 kWh$74
October3.95 m/s538 kWh$86
November4.14 m/s598 kWh$95
December4.15 m/s626 kWh$100

What a taller tower would buy

Measured at 10 m the wind in Dorchester County averages 2.8 m/s; at 50 m it is 4.81 m/s. That gives a shear exponent of 0.336, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 4,470 to 11,276 kWh a year, 152% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.54 m/s4,470 kWhover 100 years
30 m4.05 m/s6,838 kWh92 years
40 m4.46 m/s9,116 kWh69 years
50 m4.81 m/s11,276 kWh56 years

Counties around Dorchester County

4 of the 6 closest counties are windier at turbine height; the windiest, Orangeburg County, averages 4.42 m/s.

Sun versus wind in Dorchester County

Dorchester County gets 4.64 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,355 kWh a year; one kW of the turbine above makes 683. Kilowatt for kilowatt, panels make 2.0 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.