No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Douglas County, NE averages 6.33 m/s (14.2 mph). A 10 kW turbine there would make about 22,151 kWh a year, worth $2,862 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Douglas County

A home turbine is not worth buying for savings in Douglas County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.33 m/s here. Per kW, solar panels would make about 1,223 kWh a year here against the turbine's 2,215, so get a solar quote first.

What would have to change

Against the rest of NE

Douglas County is the 441st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Douglas County

April is the strongest month here, at 7.23 m/s and about 2,354 kWh. July is the weakest, 5.17 m/s and 1,165 kWh, so the best month makes 2.0 times the worst. November to March brings in 45% of the year's output in Douglas County.

MonthWind at 30 mOutputWorth
January6.57 m/s2,034 kWh$263
February6.60 m/s1,853 kWh$239
March6.83 m/s2,195 kWh$284
April7.23 m/s2,354 kWh$304
May6.54 m/s2,012 kWh$260
June5.99 m/s1,616 kWh$209
July5.17 m/s1,165 kWh$151
August5.19 m/s1,175 kWh$152
September6.23 m/s1,763 kWh$228
October6.60 m/s2,051 kWh$265
November6.70 m/s2,044 kWh$264
December6.43 m/s1,945 kWh$251

What a taller tower would buy

Measured at 10 m the wind in Douglas County averages 4.97 m/s; at 50 m it is 7.09 m/s. That gives a shear exponent of 0.221, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,155 to 27,684 kWh a year, 52% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.79 m/s18,155 kWh43 years
30 m6.33 m/s22,174 kWh35 years
40 m6.75 m/s25,230 kWh31 years
50 m7.09 m/s27,684 kWh28 years

Counties around Douglas County

1 of the 6 closest counties is windier at turbine height; the windiest, Saunders County, averages 6.41 m/s.

Sun versus wind in Douglas County

Douglas County gets 4.19 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,223 kWh a year; one kW of the turbine above makes 2,215. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.