Wind Turbine Payback in Eaton County, MI

Wind turbine payback in Eaton County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Eaton County, MI averages 6.11 m/s (13.7 mph). A 10 kW turbine there would make about 20,520 kWh a year, worth $4,459 at MI's 21.73¢/kWh. Against an installed cost of about $100,000, that is a payback of 22 years, and the turbine is built to last about 20.

What to do in Eaton County

A home turbine is not worth buying for savings in Eaton County unless your spot is far windier than the county average, 6.4 m/s at the hub against 6.11 m/s here. Per kW, solar panels would make about 1,107 kWh a year here against the turbine's 2,052, so get a solar quote first.

What would have to change

Against the rest of MI

Eaton County is the 675th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MI is Keweenaw County at 7.4 m/s, payback 15 years.

Month by month in Eaton County

January is the strongest month here, at 6.89 m/s and about 2,227 kWh. August is the weakest, 4.83 m/s and 966 kWh, so the best month makes 2.3 times the worst. November to March brings in 51% of the year's output in Eaton County.

MonthWind at 30 mOutputWorth
January6.89 m/s2,227 kWh$484
February6.87 m/s2,001 kWh$435
March6.59 m/s2,045 kWh$444
April6.83 m/s2,123 kWh$461
May6.00 m/s1,675 kWh$364
June5.32 m/s1,210 kWh$263
July4.84 m/s976 kWh$212
August4.83 m/s966 kWh$210
September5.45 m/s1,288 kWh$280
October6.42 m/s1,939 kWh$421
November6.70 m/s2,043 kWh$444
December6.65 m/s2,084 kWh$453

What a taller tower would buy

Measured at 10 m the wind in Eaton County averages 4.78 m/s; at 50 m it is 6.85 m/s. That gives a shear exponent of 0.224, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,609 to 25,964 kWh a year, 56% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.58 m/s16,609 kWh28 years
30 m6.11 m/s20,515 kWh22 years
40 m6.52 m/s23,525 kWh20 years
50 m6.85 m/s25,964 kWh18 years

Counties around Eaton County

2 of the 6 closest counties are windier at turbine height; the windiest, Ingham County, averages 6.17 m/s.

Sun versus wind in Eaton County

Eaton County gets 3.79 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,107 kWh a year; one kW of the turbine above makes 2,052. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.