TurbinePayback

Wind Turbine Payback in Elmore County, ID

Wind turbine payback in Elmore County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Elmore County, ID averages 3.85 m/s (8.6 mph). A 10 kW turbine there would make about 5,847 kWh a year, worth $761 at ID's 13.02¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Elmore County

A home turbine is not worth buying for savings in Elmore County unless your spot is far windier than the county average, 8.7 m/s at the hub against 3.85 m/s here. Per kW, solar panels would make about 1,337 kWh a year here against the turbine's 585, so get a solar quote first.

What would have to change

Against the rest of ID

Elmore County is the 2,176th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ID is Owyhee County at 5.38 m/s, payback 51 years.

Month by month in Elmore County

March is the strongest month here, at 4.12 m/s and about 610 kWh. September is the weakest, 3.61 m/s and 393 kWh, so the best month makes 1.6 times the worst. November to March brings in 45% of the year's output in Elmore County.

MonthWind at 30 mOutputWorth
January3.84 m/s492 kWh$64
February3.96 m/s489 kWh$64
March4.12 m/s610 kWh$79
April4.08 m/s575 kWh$75
May3.84 m/s492 kWh$64
June3.76 m/s446 kWh$58
July3.65 m/s419 kWh$55
August3.60 m/s403 kWh$52
September3.61 m/s393 kWh$51
October3.78 m/s468 kWh$61
November3.96 m/s524 kWh$68
December3.95 m/s538 kWh$70

What a taller tower would buy

Measured at 10 m the wind in Elmore County averages 2.88 m/s; at 50 m it is 4.4 m/s. That gives a shear exponent of 0.263, typical of ordinary open country. Going from 20 m to 50 m takes output from 4,163 to 8,748 kWh a year, 110% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.46 m/s4,163 kWhover 100 years
30 m3.85 m/s5,832 kWhover 100 years
40 m4.15 m/s7,350 kWhover 100 years
50 m4.4 m/s8,748 kWh88 years

Counties around Elmore County

4 of the 6 closest counties are windier at turbine height; the windiest, Gooding County, averages 4.99 m/s.

Sun versus wind in Elmore County

Elmore County gets 4.58 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,337 kWh a year; one kW of the turbine above makes 585. Kilowatt for kilowatt, panels make 2.3 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.