Wind Turbine Payback in Franklin County, VT

Wind turbine payback in Franklin County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Franklin County, VT averages 3.97 m/s (8.9 mph). A 10 kW turbine there would make about 6,428 kWh a year, worth $1,538 at VT's 23.93¢/kWh. Against an installed cost of about $100,000, that is a payback of 65 years, and the turbine is built to last about 20.

What to do in Franklin County

A home turbine is not worth buying for savings in Franklin County unless your spot is far windier than the county average, 6.2 m/s at the hub against 3.97 m/s here. Per kW, solar panels would make about 1,013 kWh a year here against the turbine's 643, so get a solar quote first.

What would have to change

Against the rest of VT

Franklin County is the 2,080th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. It is the windiest county in VT.

Month by month in Franklin County

March is the strongest month here, at 4.73 m/s and about 916 kWh. August is the weakest, 3.23 m/s and 284 kWh, so the best month makes 3.2 times the worst. November to March brings in 57% of the year's output in Franklin County.

MonthWind at 30 mOutputWorth
January4.52 m/s806 kWh$193
February4.80 m/s860 kWh$206
March4.73 m/s916 kWh$219
April4.43 m/s735 kWh$176
May3.77 m/s464 kWh$111
June3.37 m/s316 kWh$76
July3.25 m/s289 kWh$69
August3.23 m/s284 kWh$68
September3.44 m/s337 kWh$81
October3.82 m/s483 kWh$116
November4.08 m/s576 kWh$138
December4.17 m/s632 kWh$151

What a taller tower would buy

Measured at 10 m the wind in Franklin County averages 2.68 m/s; at 50 m it is 4.76 m/s. That gives a shear exponent of 0.357, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 4,063 to 10,954 kWh a year, 170% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.43 m/s4,063 kWhover 100 years
30 m3.97 m/s6,410 kWh65 years
40 m4.4 m/s8,722 kWh48 years
50 m4.76 m/s10,954 kWh38 years

Counties around Franklin County

1 of the 6 closest counties is windier at turbine height; the windiest, Clinton County, averages 4.11 m/s.

Sun versus wind in Franklin County

Franklin County gets 3.47 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,013 kWh a year; one kW of the turbine above makes 643. Kilowatt for kilowatt, panels make 1.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.