No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Gasconade County, MO averages 3.63 m/s (8.1 mph). A 10 kW turbine there would make about 4,862 kWh a year, worth $694 at MO's 14.28¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Gasconade County

A home turbine is not worth buying for savings in Gasconade County unless your spot is far windier than the county average, 8.2 m/s at the hub against 3.63 m/s here. Per kW, solar panels would make about 1,235 kWh a year here against the turbine's 486, so get a solar quote first.

What would have to change

Against the rest of MO

Gasconade County is the 2,354th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MO is Atchison County at 6.17 m/s, payback 33 years.

Month by month in Gasconade County

March is the strongest month here, at 4.22 m/s and about 657 kWh. July is the weakest, 2.81 m/s and 175 kWh, so the best month makes 3.8 times the worst. November to March brings in 56% of the year's output in Gasconade County.

MonthWind at 30 mOutputWorth
January4.14 m/s620 kWh$89
February4.20 m/s583 kWh$83
March4.22 m/s657 kWh$94
April4.19 m/s621 kWh$89
May3.53 m/s376 kWh$54
June3.13 m/s247 kWh$35
July2.81 m/s175 kWh$25
August2.82 m/s179 kWh$26
September3.13 m/s247 kWh$35
October3.65 m/s419 kWh$60
November3.89 m/s496 kWh$71
December3.92 m/s526 kWh$75

What a taller tower would buy

Measured at 10 m the wind in Gasconade County averages 2.3 m/s; at 50 m it is 4.49 m/s. That gives a shear exponent of 0.416, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,803 to 9,279 kWh a year, 231% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.07 m/s2,803 kWhover 100 years
30 m3.63 m/s4,864 kWhover 100 years
40 m4.09 m/s7,048 kWh99 years
50 m4.49 m/s9,279 kWh76 years

Counties around Gasconade County

3 of the 6 closest counties are windier at turbine height; the windiest, Warren County, averages 4.55 m/s.

Sun versus wind in Gasconade County

Gasconade County gets 4.23 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,235 kWh a year; one kW of the turbine above makes 486. Kilowatt for kilowatt, panels make 2.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.