Wind Turbine Payback in Grant County, OR

Wind turbine payback in Grant County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Grant County, OR averages 3.34 m/s (7.5 mph). A 10 kW turbine there would make about 3,720 kWh a year, worth $575 at OR's 15.46¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Grant County

A home turbine is not worth buying for savings in Grant County unless your spot is far windier than the county average, 7.8 m/s at the hub against 3.34 m/s here. Per kW, solar panels would make about 1,261 kWh a year here against the turbine's 372, so get a solar quote first.

What would have to change

Against the rest of OR

Grant County is the 2,699th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in OR is Gilliam County at 5.48 m/s, payback 41 years.

Month by month in Grant County

January is the strongest month here, at 3.68 m/s and about 433 kWh. September is the weakest, 2.92 m/s and 195 kWh, so the best month makes 2.2 times the worst. November to March brings in 54% of the year's output in Grant County.

MonthWind at 30 mOutputWorth
January3.68 m/s433 kWh$67
February3.63 m/s374 kWh$58
March3.66 m/s424 kWh$66
April3.46 m/s342 kWh$53
May3.16 m/s262 kWh$41
June3.13 m/s247 kWh$38
July2.99 m/s218 kWh$34
August2.93 m/s203 kWh$31
September2.92 m/s195 kWh$30
October3.26 m/s291 kWh$45
November3.62 m/s395 kWh$61
December3.68 m/s430 kWh$66

What a taller tower would buy

Measured at 10 m the wind in Grant County averages 2.29 m/s; at 50 m it is 3.98 m/s. That gives a shear exponent of 0.343, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,333 to 6,477 kWh a year, 178% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.91 m/s2,333 kWhover 100 years
30 m3.34 m/s3,722 kWhover 100 years
40 m3.69 m/s5,106 kWhover 100 years
50 m3.98 m/s6,477 kWh100 years

Counties around Grant County

6 of the 6 closest counties are windier at turbine height; the windiest, Morrow County, averages 5.25 m/s.

Sun versus wind in Grant County

Grant County gets 4.32 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,261 kWh a year; one kW of the turbine above makes 372. Kilowatt for kilowatt, panels make 3.4 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.