Wind turbine payback in Granville County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Granville County, NC averages 3.75 m/s (8.4 mph). A 10 kW turbine there would make about 5,387 kWh a year, worth $805 at NC's 14.94¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Granville County

A home turbine is not worth buying for savings in Granville County unless your spot is far windier than the county average, 7.9 m/s at the hub against 3.75 m/s here. Per kW, solar panels would make about 1,276 kWh a year here against the turbine's 539, so get a solar quote first.

What would have to change

Against the rest of NC

Granville County is the 2,250th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NC is Dare County at 6.91 m/s, payback 25 years.

Month by month in Granville County

March is the strongest month here, at 4.41 m/s and about 749 kWh. August is the weakest, 2.88 m/s and 191 kWh, so the best month makes 3.9 times the worst. November to March brings in 55% of the year's output in Granville County.

MonthWind at 30 mOutputWorth
January4.28 m/s684 kWh$102
February4.43 m/s684 kWh$102
March4.41 m/s749 kWh$112
April4.37 m/s705 kWh$105
May3.69 m/s435 kWh$65
June3.25 m/s279 kWh$42
July2.96 m/s211 kWh$32
August2.88 m/s191 kWh$29
September3.29 m/s291 kWh$43
October3.66 m/s423 kWh$63
November3.88 m/s491 kWh$73
December3.98 m/s552 kWh$82

What a taller tower would buy

Measured at 10 m the wind in Granville County averages 2.57 m/s; at 50 m it is 4.47 m/s. That gives a shear exponent of 0.344, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 3,441 to 9,160 kWh a year, 166% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.26 m/s3,441 kWhover 100 years
30 m3.75 m/s5,385 kWhover 100 years
40 m4.14 m/s7,299 kWh92 years
50 m4.47 m/s9,160 kWh73 years

Counties around Granville County

2 of the 6 closest counties are windier at turbine height; the windiest, Franklin County, averages 4.35 m/s.

Sun versus wind in Granville County

Granville County gets 4.37 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,276 kWh a year; one kW of the turbine above makes 539. Kilowatt for kilowatt, panels make 2.4 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.