TurbinePayback

Wind Turbine Payback in Graves County, KY

Wind turbine payback in Graves County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Graves County, KY averages 5.26 m/s (11.8 mph). A 10 kW turbine there would make about 14,327 kWh a year, worth $2,034 at KY's 14.2¢/kWh. Against an installed cost of about $100,000, that is a payback of 49 years, and the turbine is built to last about 20.

What to do in Graves County

A home turbine is not worth buying for savings in Graves County unless your spot is far windier than the county average, 8.2 m/s at the hub against 5.26 m/s here. Per kW, solar panels would make about 1,250 kWh a year here against the turbine's 1,433, so get a solar quote first.

What would have to change

Against the rest of KY

Graves County is the 1,339th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in KY is Fulton County at 5.54 m/s, payback 43 years.

Month by month in Graves County

April is the strongest month here, at 6.31 m/s and about 1,806 kWh. July is the weakest, 3.92 m/s and 525 kWh, so the best month makes 3.4 times the worst. November to March brings in 54% of the year's output in Graves County.

MonthWind at 30 mOutputWorth
January5.94 m/s1,634 kWh$232
February6.02 m/s1,526 kWh$217
March6.16 m/s1,772 kWh$252
April6.31 m/s1,806 kWh$256
May5.26 m/s1,218 kWh$173
June4.37 m/s703 kWh$100
July3.92 m/s525 kWh$75
August3.96 m/s543 kWh$77
September4.50 m/s767 kWh$109
October5.25 m/s1,213 kWh$172
November5.74 m/s1,464 kWh$208
December5.75 m/s1,519 kWh$216

What a taller tower would buy

Measured at 10 m the wind in Graves County averages 3.97 m/s; at 50 m it is 6 m/s. That gives a shear exponent of 0.257, typical of ordinary open country. Going from 20 m to 50 m takes output from 10,833 to 19,704 kWh a year, 82% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.74 m/s10,833 kWh65 years
30 m5.26 m/s14,339 kWh49 years
40 m5.67 m/s17,240 kWh41 years
50 m6 m/s19,704 kWh36 years

Counties around Graves County

None of the 6 closest counties is windier than Graves County.

Sun versus wind in Graves County

Graves County gets 4.28 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,250 kWh a year; one kW of the turbine above makes 1,433. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.