Wind Turbine Payback in Grayson County, KY

Wind turbine payback in Grayson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Grayson County, KY averages 4.2 m/s (9.4 mph). A 10 kW turbine there would make about 7,623 kWh a year, worth $1,083 at KY's 14.2¢/kWh. Against an installed cost of about $100,000, that is a payback of 92 years, and the turbine is built to last about 20.

What to do in Grayson County

A home turbine is not worth buying for savings in Grayson County unless your spot is far windier than the county average, 8.2 m/s at the hub against 4.2 m/s here. Per kW, solar panels would make about 1,215 kWh a year here against the turbine's 762, so get a solar quote first.

What would have to change

Against the rest of KY

Grayson County is the 1,951st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in KY is Fulton County at 5.54 m/s, payback 43 years.

Month by month in Grayson County

March is the strongest month here, at 4.98 m/s and about 1,051 kWh. August is the weakest, 3.13 m/s and 255 kWh, so the best month makes 4.1 times the worst. November to March brings in 57% of the year's output in Grayson County.

MonthWind at 30 mOutputWorth
January4.88 m/s998 kWh$142
February4.94 m/s932 kWh$132
March4.98 m/s1,051 kWh$149
April4.99 m/s1,026 kWh$146
May4.09 m/s596 kWh$85
June3.49 m/s354 kWh$50
July3.14 m/s257 kWh$36
August3.13 m/s255 kWh$36
September3.52 m/s362 kWh$51
October4.13 m/s615 kWh$87
November4.49 m/s764 kWh$108
December4.62 m/s855 kWh$121

What a taller tower would buy

Measured at 10 m the wind in Grayson County averages 2.93 m/s; at 50 m it is 4.96 m/s. That gives a shear exponent of 0.327, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 5,059 to 12,266 kWh a year, 142% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.68 m/s5,059 kWhover 100 years
30 m4.2 m/s7,607 kWh93 years
40 m4.61 m/s10,014 kWh70 years
50 m4.96 m/s12,266 kWh57 years

Counties around Grayson County

4 of the 6 closest counties are windier at turbine height; the windiest, Edmonson County, averages 4.47 m/s.

Sun versus wind in Grayson County

Grayson County gets 4.16 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,215 kWh a year; one kW of the turbine above makes 762. Kilowatt for kilowatt, panels make 1.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.