TurbinePayback

Wind Turbine Payback in Grayson County, VA

Wind turbine payback in Grayson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Grayson County, VA averages 3.49 m/s (7.8 mph). A 10 kW turbine there would make about 4,289 kWh a year, worth $727 at VA's 16.95¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Grayson County

A home turbine is not worth buying for savings in Grayson County unless your spot is far windier than the county average, 7.3 m/s at the hub against 3.49 m/s here. Per kW, solar panels would make about 1,235 kWh a year here against the turbine's 429, so get a solar quote first.

What would have to change

Against the rest of VA

Grayson County is the 2,519th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in VA is Northampton County at 7.01 m/s, payback 22 years.

Month by month in Grayson County

January is the strongest month here, at 4.25 m/s and about 671 kWh. August is the weakest, 2.51 m/s and 116 kWh, so the best month makes 5.8 times the worst. November to March brings in 61% of the year's output in Grayson County.

MonthWind at 30 mOutputWorth
January4.25 m/s671 kWh$114
February4.35 m/s647 kWh$110
March4.19 m/s641 kWh$109
April4.06 m/s565 kWh$96
May3.33 m/s313 kWh$53
June2.93 m/s197 kWh$33
July2.67 m/s146 kWh$25
August2.51 m/s116 kWh$20
September2.79 m/s165 kWh$28
October3.34 m/s315 kWh$53
November3.66 m/s409 kWh$69
December3.88 m/s509 kWh$86

What a taller tower would buy

Measured at 10 m the wind in Grayson County averages 2.16 m/s; at 50 m it is 4.36 m/s. That gives a shear exponent of 0.436, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,382 to 8,517 kWh a year, 258% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.92 m/s2,382 kWhover 100 years
30 m3.49 m/s4,287 kWhover 100 years
40 m3.96 m/s6,357 kWh93 years
50 m4.36 m/s8,517 kWh69 years

Counties around Grayson County

4 of the 6 closest counties are windier at turbine height; the windiest, Galax city, averages 3.78 m/s.

Sun versus wind in Grayson County

Grayson County gets 4.23 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,235 kWh a year; one kW of the turbine above makes 429. Kilowatt for kilowatt, panels make 2.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.