No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Greenup County, KY averages 3.24 m/s (7.2 mph). A 10 kW turbine there would make about 3,367 kWh a year, worth $478 at KY's 14.2¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Greenup County

A home turbine is not worth buying for savings in Greenup County unless your spot is far windier than the county average, 8.2 m/s at the hub against 3.24 m/s here. Per kW, solar panels would make about 1,168 kWh a year here against the turbine's 337, so get a solar quote first.

What would have to change

Against the rest of KY

Greenup County is the 2,831st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in KY is Fulton County at 5.54 m/s, payback 43 years.

Month by month in Greenup County

January is the strongest month here, at 3.85 m/s and about 495 kWh. August is the weakest, 2.47 m/s and 110 kWh, so the best month makes 4.5 times the worst. November to March brings in 59% of the year's output in Greenup County.

MonthWind at 30 mOutputWorth
January3.85 m/s495 kWh$70
February3.89 m/s464 kWh$66
March3.78 m/s470 kWh$67
April3.74 m/s440 kWh$62
May3.09 m/s244 kWh$35
June2.76 m/s159 kWh$23
July2.50 m/s114 kWh$16
August2.47 m/s110 kWh$16
September2.72 m/s151 kWh$21
October3.16 m/s263 kWh$37
November3.40 m/s325 kWh$46
December3.55 m/s386 kWh$55

What a taller tower would buy

Measured at 10 m the wind in Greenup County averages 1.95 m/s; at 50 m it is 4.1 m/s. That gives a shear exponent of 0.462, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,761 to 7,090 kWh a year, 303% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.68 m/s1,761 kWhover 100 years
30 m3.24 m/s3,361 kWhover 100 years
40 m3.7 m/s5,157 kWhover 100 years
50 m4.1 m/s7,090 kWh99 years

Counties around Greenup County

1 of the 6 closest counties is windier at turbine height; the windiest, Scioto County, averages 3.73 m/s.

Sun versus wind in Greenup County

Greenup County gets 4 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,168 kWh a year; one kW of the turbine above makes 337. Kilowatt for kilowatt, panels make 3.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.