TurbinePayback

Wind Turbine Payback in Grenada County, MS

Wind turbine payback in Grenada County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Grenada County, MS averages 4.24 m/s (9.5 mph). A 10 kW turbine there would make about 7,842 kWh a year, worth $1,181 at MS's 15.06¢/kWh. Against an installed cost of about $100,000, that is a payback of 85 years, and the turbine is built to last about 20.

What to do in Grenada County

A home turbine is not worth buying for savings in Grenada County unless your spot is far windier than the county average, 7.9 m/s at the hub against 4.24 m/s here. Per kW, solar panels would make about 1,326 kWh a year here against the turbine's 784, so get a solar quote first.

What would have to change

Against the rest of MS

Grenada County is the 1,920th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MS is DeSoto County at 5.13 m/s, payback 50 years.

Month by month in Grenada County

March is the strongest month here, at 4.99 m/s and about 1,061 kWh. July is the weakest, 3.08 m/s and 241 kWh, so the best month makes 4.4 times the worst. November to March brings in 56% of the year's output in Grenada County.

MonthWind at 30 mOutputWorth
January4.84 m/s975 kWh$147
February4.94 m/s932 kWh$140
March4.99 m/s1,061 kWh$160
April5.00 m/s1,032 kWh$155
May4.18 m/s640 kWh$96
June3.51 m/s359 kWh$54
July3.08 m/s241 kWh$36
August3.16 m/s264 kWh$40
September3.76 m/s446 kWh$67
October4.21 m/s652 kWh$98
November4.63 m/s832 kWh$125
December4.71 m/s905 kWh$136

What a taller tower would buy

Measured at 10 m the wind in Grenada County averages 3.01 m/s; at 50 m it is 4.98 m/s. That gives a shear exponent of 0.313, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 5,334 to 12,400 kWh a year, 132% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.74 m/s5,334 kWhover 100 years
30 m4.24 m/s7,865 kWh84 years
40 m4.64 m/s10,220 kWh65 years
50 m4.98 m/s12,400 kWh54 years

Counties around Grenada County

None of the 6 closest counties is windier than Grenada County.

Sun versus wind in Grenada County

Grenada County gets 4.54 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,326 kWh a year; one kW of the turbine above makes 784. Kilowatt for kilowatt, panels make 1.7 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.