TurbinePayback

Wind Turbine Payback in Hand County, SD

Wind turbine payback in Hand County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Hand County, SD averages 6.35 m/s (14.2 mph). A 10 kW turbine there would make about 22,299 kWh a year, worth $3,251 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Hand County

A home turbine is not worth buying for savings in Hand County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.35 m/s here. Per kW, solar panels would make about 1,221 kWh a year here against the turbine's 2,230, so get a solar quote first.

What would have to change

Against the rest of SD

Hand County is the 402nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Hand County

October is the strongest month here, at 6.78 m/s and about 2,164 kWh. July is the weakest, 5.57 m/s and 1,407 kWh, so the best month makes 1.5 times the worst. November to March brings in 43% of the year's output in Hand County.

MonthWind at 30 mOutputWorth
January6.46 m/s1,963 kWh$286
February6.30 m/s1,682 kWh$245
March6.57 m/s2,030 kWh$296
April6.88 m/s2,153 kWh$314
May6.59 m/s2,047 kWh$298
June6.05 m/s1,649 kWh$240
July5.57 m/s1,407 kWh$205
August5.64 m/s1,446 kWh$211
September6.55 m/s1,954 kWh$285
October6.78 m/s2,164 kWh$316
November6.53 m/s1,943 kWh$283
December6.34 m/s1,890 kWh$276

What a taller tower would buy

Measured at 10 m the wind in Hand County averages 5.02 m/s; at 50 m it is 7.09 m/s. That gives a shear exponent of 0.215, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,390 to 27,684 kWh a year, 51% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.82 m/s18,390 kWh37 years
30 m6.35 m/s22,318 kWh31 years
40 m6.76 m/s25,296 kWh27 years
50 m7.09 m/s27,684 kWh25 years

Counties around Hand County

3 of the 6 closest counties are windier at turbine height; the windiest, Hyde County, averages 6.4 m/s.

Sun versus wind in Hand County

Hand County gets 4.18 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,221 kWh a year; one kW of the turbine above makes 2,230. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.