TurbinePayback

Wind Turbine Payback in Harding County, NM

Wind turbine payback in Harding County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Harding County, NM averages 6.25 m/s (14 mph). A 10 kW turbine there would make about 21,558 kWh a year, worth $3,307 at NM's 15.34¢/kWh. Against an installed cost of about $100,000, that is a payback of 30 years, and the turbine is built to last about 20.

What to do in Harding County

A home turbine is not worth buying for savings in Harding County unless your spot is far windier than the county average, 7.8 m/s at the hub against 6.25 m/s here. Per kW, solar panels would make about 1,594 kWh a year here against the turbine's 2,156, so get a solar quote first.

What would have to change

Against the rest of NM

Harding County is the 528th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NM is Union County at 6.75 m/s, payback 26 years.

Month by month in Harding County

April is the strongest month here, at 7.18 m/s and about 2,326 kWh. August is the weakest, 5.11 m/s and 1,129 kWh, so the best month makes 2.1 times the worst. November to March brings in 46% of the year's output in Harding County.

MonthWind at 30 mOutputWorth
January6.38 m/s1,910 kWh$293
February6.66 m/s1,886 kWh$289
March6.95 m/s2,264 kWh$347
April7.18 m/s2,326 kWh$357
May6.51 m/s1,994 kWh$306
June6.18 m/s1,729 kWh$265
July5.19 m/s1,176 kWh$180
August5.11 m/s1,129 kWh$173
September5.73 m/s1,459 kWh$224
October6.19 m/s1,793 kWh$275
November6.57 m/s1,967 kWh$302
December6.47 m/s1,966 kWh$302

What a taller tower would buy

Measured at 10 m the wind in Harding County averages 4.87 m/s; at 50 m it is 7.02 m/s. That gives a shear exponent of 0.227, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,504 to 27,186 kWh a year, 55% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.7 m/s17,504 kWh37 years
30 m6.25 m/s21,569 kWh30 years
40 m6.67 m/s24,679 kWh26 years
50 m7.02 m/s27,186 kWh24 years

Counties around Harding County

3 of the 6 closest counties are windier at turbine height; the windiest, Union County, averages 6.75 m/s.

Sun versus wind in Harding County

Harding County gets 5.46 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,594 kWh a year; one kW of the turbine above makes 2,156. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.