TurbinePayback

Wind Turbine Payback in Henderson County, KY

Wind turbine payback in Henderson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Henderson County, KY averages 5.42 m/s (12.1 mph). A 10 kW turbine there would make about 15,462 kWh a year, worth $2,196 at KY's 14.2¢/kWh. Against an installed cost of about $100,000, that is a payback of 46 years, and the turbine is built to last about 20.

What to do in Henderson County

A home turbine is not worth buying for savings in Henderson County unless your spot is far windier than the county average, 8.2 m/s at the hub against 5.42 m/s here. Per kW, solar panels would make about 1,223 kWh a year here against the turbine's 1,546, so get a solar quote first.

What would have to change

Against the rest of KY

Henderson County is the 1,264th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in KY is Fulton County at 5.54 m/s, payback 43 years.

Month by month in Henderson County

April is the strongest month here, at 6.45 m/s and about 1,896 kWh. July is the weakest, 3.98 m/s and 551 kWh, so the best month makes 3.4 times the worst. November to March brings in 54% of the year's output in Henderson County.

MonthWind at 30 mOutputWorth
January6.22 m/s1,810 kWh$257
February6.18 m/s1,614 kWh$229
March6.32 m/s1,876 kWh$266
April6.45 m/s1,896 kWh$269
May5.42 m/s1,316 kWh$187
June4.57 m/s803 kWh$114
July3.98 m/s551 kWh$78
August3.99 m/s555 kWh$79
September4.50 m/s768 kWh$109
October5.53 m/s1,381 kWh$196
November5.98 m/s1,607 kWh$228
December5.97 m/s1,655 kWh$235

What a taller tower would buy

Measured at 10 m the wind in Henderson County averages 4.11 m/s; at 50 m it is 6.17 m/s. That gives a shear exponent of 0.252, typical of ordinary open country. Going from 20 m to 50 m takes output from 11,852 to 20,965 kWh a year, 77% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.9 m/s11,852 kWh59 years
30 m5.42 m/s15,496 kWh45 years
40 m5.83 m/s18,467 kWh38 years
50 m6.17 m/s20,965 kWh34 years

Counties around Henderson County

1 of the 6 closest counties is windier at turbine height; the windiest, Posey County, averages 5.53 m/s.

Sun versus wind in Henderson County

Henderson County gets 4.19 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,223 kWh a year; one kW of the turbine above makes 1,546. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.3 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.