TurbinePayback

Wind Turbine Payback in Holmes County, MS

Wind turbine payback in Holmes County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Holmes County, MS averages 3.71 m/s (8.3 mph). A 10 kW turbine there would make about 5,209 kWh a year, worth $784 at MS's 15.06¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Holmes County

A home turbine is not worth buying for savings in Holmes County unless your spot is far windier than the county average, 7.9 m/s at the hub against 3.71 m/s here. Per kW, solar panels would make about 1,340 kWh a year here against the turbine's 521, so get a solar quote first.

What would have to change

Against the rest of MS

Holmes County is the 2,280th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MS is DeSoto County at 5.13 m/s, payback 50 years.

Month by month in Holmes County

March is the strongest month here, at 4.30 m/s and about 692 kWh. July is the weakest, 2.81 m/s and 176 kWh, so the best month makes 3.9 times the worst. November to March brings in 56% of the year's output in Holmes County.

MonthWind at 30 mOutputWorth
January4.16 m/s631 kWh$95
February4.26 m/s611 kWh$92
March4.30 m/s692 kWh$104
April4.31 m/s677 kWh$102
May3.62 m/s409 kWh$62
June3.11 m/s241 kWh$36
July2.81 m/s176 kWh$27
August2.89 m/s193 kWh$29
September3.31 m/s298 kWh$45
October3.73 m/s449 kWh$68
November4.04 m/s557 kWh$84
December4.09 m/s597 kWh$90

What a taller tower would buy

Measured at 10 m the wind in Holmes County averages 2.45 m/s; at 50 m it is 4.5 m/s. That gives a shear exponent of 0.378, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 3,174 to 9,339 kWh a year, 194% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.18 m/s3,174 kWhover 100 years
30 m3.71 m/s5,208 kWhover 100 years
40 m4.14 m/s7,280 kWh91 years
50 m4.5 m/s9,339 kWh71 years

Counties around Holmes County

4 of the 6 closest counties are windier at turbine height; the windiest, Humphreys County, averages 4.92 m/s.

Sun versus wind in Holmes County

Holmes County gets 4.59 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,340 kWh a year; one kW of the turbine above makes 521. Kilowatt for kilowatt, panels make 2.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.