Wind turbine payback in Hood River County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Hood River County, OR averages 3.14 m/s (7 mph). A 10 kW turbine there would make about 3,034 kWh a year, worth $469 at OR's 15.46¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Hood River County

A home turbine is not worth buying for savings in Hood River County unless your spot is far windier than the county average, 7.8 m/s at the hub against 3.14 m/s here. Per kW, solar panels would make about 1,229 kWh a year here against the turbine's 303, so get a solar quote first.

What would have to change

Against the rest of OR

Hood River County is the 2,952nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in OR is Gilliam County at 5.48 m/s, payback 41 years.

Month by month in Hood River County

January is the strongest month here, at 3.71 m/s and about 443 kWh. August is the weakest, 2.65 m/s and 143 kWh, so the best month makes 3.1 times the worst. November to March brings in 59% of the year's output in Hood River County.

MonthWind at 30 mOutputWorth
January3.71 m/s443 kWh$68
February3.48 m/s327 kWh$51
March3.32 m/s309 kWh$48
April3.08 m/s233 kWh$36
May2.86 m/s186 kWh$29
June2.87 m/s184 kWh$28
July2.70 m/s153 kWh$24
August2.65 m/s143 kWh$22
September2.76 m/s159 kWh$25
October3.10 m/s248 kWh$38
November3.55 m/s372 kWh$58
December3.66 m/s425 kWh$66

What a taller tower would buy

Measured at 10 m the wind in Hood River County averages 2.07 m/s; at 50 m it is 3.82 m/s. That gives a shear exponent of 0.381, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,783 to 5,707 kWh a year, 220% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.69 m/s1,783 kWhover 100 years
30 m3.14 m/s3,048 kWhover 100 years
40 m3.51 m/s4,363 kWhover 100 years
50 m3.82 m/s5,707 kWhover 100 years

Counties around Hood River County

4 of the 6 closest counties are windier at turbine height; the windiest, Sherman County, averages 4.8 m/s.

Sun versus wind in Hood River County

Hood River County gets 4.21 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,229 kWh a year; one kW of the turbine above makes 303. Kilowatt for kilowatt, panels make 4.1 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.