Wind turbine payback in Ida County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Ida County, IA averages 6.44 m/s (14.4 mph). A 10 kW turbine there would make about 22,964 kWh a year, worth $3,341 at IA's 14.55¢/kWh. Against an installed cost of about $100,000, that is a payback of 30 years, and the turbine is built to last about 20.

What to do in Ida County

A home turbine is not worth buying for savings in Ida County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.44 m/s here. Per kW, solar panels would make about 1,206 kWh a year here against the turbine's 2,296, so get a solar quote first.

What would have to change

Against the rest of IA

Ida County is the 280th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IA is Dickinson County at 6.59 m/s, payback 29 years.

Month by month in Ida County

April is the strongest month here, at 7.32 m/s and about 2,405 kWh. August is the weakest, 5.30 m/s and 1,240 kWh, so the best month makes 1.9 times the worst. November to March brings in 45% of the year's output in Ida County.

MonthWind at 30 mOutputWorth
January6.65 m/s2,083 kWh$303
February6.69 m/s1,901 kWh$277
March6.91 m/s2,243 kWh$326
April7.32 m/s2,405 kWh$350
May6.70 m/s2,110 kWh$307
June6.02 m/s1,634 kWh$238
July5.31 m/s1,245 kWh$181
August5.30 m/s1,240 kWh$180
September6.34 m/s1,825 kWh$266
October6.74 m/s2,138 kWh$311
November6.77 m/s2,085 kWh$303
December6.54 m/s2,016 kWh$293

What a taller tower would buy

Measured at 10 m the wind in Ida County averages 5.09 m/s; at 50 m it is 7.18 m/s. That gives a shear exponent of 0.214, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,975 to 28,320 kWh a year, 49% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.9 m/s18,975 kWh36 years
30 m6.44 m/s22,939 kWh30 years
40 m6.85 m/s25,929 kWh27 years
50 m7.18 m/s28,320 kWh24 years

Counties around Ida County

2 of the 6 closest counties are windier at turbine height; the windiest, Sac County, averages 6.45 m/s.

Sun versus wind in Ida County

Ida County gets 4.13 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,206 kWh a year; one kW of the turbine above makes 2,296. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.