TurbinePayback

Wind Turbine Payback in Jasper County, IA

Wind turbine payback in Jasper County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Jasper County, IA averages 6.07 m/s (13.6 mph). A 10 kW turbine there would make about 20,223 kWh a year, worth $2,942 at IA's 14.55¢/kWh. Against an installed cost of about $100,000, that is a payback of 34 years, and the turbine is built to last about 20.

What to do in Jasper County

A home turbine is not worth buying for savings in Jasper County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.07 m/s here. Per kW, solar panels would make about 1,194 kWh a year here against the turbine's 2,022, so get a solar quote first.

What would have to change

Against the rest of IA

Jasper County is the 717th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IA is Dickinson County at 6.59 m/s, payback 29 years.

Month by month in Jasper County

April is the strongest month here, at 6.97 m/s and about 2,206 kWh. August is the weakest, 4.82 m/s and 963 kWh, so the best month makes 2.3 times the worst. November to March brings in 48% of the year's output in Jasper County.

MonthWind at 30 mOutputWorth
January6.46 m/s1,966 kWh$286
February6.47 m/s1,780 kWh$259
March6.70 m/s2,110 kWh$307
April6.97 m/s2,206 kWh$321
May6.23 m/s1,820 kWh$265
June5.51 m/s1,326 kWh$193
July4.85 m/s978 kWh$142
August4.82 m/s963 kWh$140
September5.71 m/s1,443 kWh$210
October6.35 m/s1,893 kWh$275
November6.56 m/s1,961 kWh$285
December6.29 m/s1,854 kWh$270

What a taller tower would buy

Measured at 10 m the wind in Jasper County averages 4.72 m/s; at 50 m it is 6.83 m/s. That gives a shear exponent of 0.230, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,269 to 25,819 kWh a year, 59% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.53 m/s16,269 kWh42 years
30 m6.07 m/s20,244 kWh34 years
40 m6.49 m/s23,321 kWh30 years
50 m6.83 m/s25,819 kWh27 years

Counties around Jasper County

3 of the 6 closest counties are windier at turbine height; the windiest, Story County, averages 6.21 m/s.

Sun versus wind in Jasper County

Jasper County gets 4.09 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,194 kWh a year; one kW of the turbine above makes 2,022. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.