No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Jeff Davis County, GA averages 4.56 m/s (10.2 mph). A 10 kW turbine there would make about 9,702 kWh a year, worth $1,502 at GA's 15.48¢/kWh. Against an installed cost of about $100,000, that is a payback of 67 years, and the turbine is built to last about 20.

What to do in Jeff Davis County

A home turbine is not worth buying for savings in Jeff Davis County unless your spot is far windier than the county average, 7.8 m/s at the hub against 4.56 m/s here. Per kW, solar panels would make about 1,381 kWh a year here against the turbine's 970, so get a solar quote first.

What would have to change

Against the rest of GA

Jeff Davis County is the 1,711th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in GA is Glynn County at 5.08 m/s, payback 49 years.

Month by month in Jeff Davis County

March is the strongest month here, at 5.21 m/s and about 1,187 kWh. August is the weakest, 3.60 m/s and 402 kWh, so the best month makes 3.0 times the worst. November to March brings in 52% of the year's output in Jeff Davis County.

MonthWind at 30 mOutputWorth
January5.06 m/s1,101 kWh$170
February5.07 m/s999 kWh$155
March5.21 m/s1,187 kWh$184
April5.05 m/s1,060 kWh$164
May4.55 m/s820 kWh$127
June3.91 m/s505 kWh$78
July3.72 m/s447 kWh$69
August3.60 m/s402 kWh$62
September4.31 m/s677 kWh$105
October4.57 m/s829 kWh$128
November4.80 m/s923 kWh$143
December4.85 m/s983 kWh$152

What a taller tower would buy

Measured at 10 m the wind in Jeff Davis County averages 3.34 m/s; at 50 m it is 5.27 m/s. That gives a shear exponent of 0.283, typical of ordinary open country. Going from 20 m to 50 m takes output from 6,915 to 14,397 kWh a year, 108% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.07 m/s6,915 kWh93 years
30 m4.56 m/s9,706 kWh67 years
40 m4.95 m/s12,182 kWh53 years
50 m5.27 m/s14,397 kWh45 years

Counties around Jeff Davis County

None of the 6 closest counties is windier than Jeff Davis County.

Sun versus wind in Jeff Davis County

Jeff Davis County gets 4.73 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,381 kWh a year; one kW of the turbine above makes 970. Kilowatt for kilowatt, panels make 1.4 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.