No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Jefferson County, IA averages 5.97 m/s (13.4 mph). A 10 kW turbine there would make about 19,482 kWh a year, worth $2,835 at IA's 14.55¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Jefferson County

A home turbine is not worth buying for savings in Jefferson County unless your spot is far windier than the county average, 8.1 m/s at the hub against 5.97 m/s here. Per kW, solar panels would make about 1,177 kWh a year here against the turbine's 1,948, so get a solar quote first.

What would have to change

Against the rest of IA

Jefferson County is the 891st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IA is Dickinson County at 6.59 m/s, payback 29 years.

Month by month in Jefferson County

April is the strongest month here, at 6.90 m/s and about 2,162 kWh. August is the weakest, 4.67 m/s and 879 kWh, so the best month makes 2.5 times the worst. November to March brings in 49% of the year's output in Jefferson County.

MonthWind at 30 mOutputWorth
January6.46 m/s1,963 kWh$286
February6.44 m/s1,763 kWh$257
March6.64 m/s2,074 kWh$302
April6.90 m/s2,162 kWh$315
May6.06 m/s1,712 kWh$249
June5.39 m/s1,251 kWh$182
July4.69 m/s894 kWh$130
August4.67 m/s879 kWh$128
September5.47 m/s1,298 kWh$189
October6.26 m/s1,835 kWh$267
November6.53 m/s1,943 kWh$283
December6.25 m/s1,829 kWh$266

What a taller tower would buy

Measured at 10 m the wind in Jefferson County averages 4.63 m/s; at 50 m it is 6.72 m/s. That gives a shear exponent of 0.231, typical of ordinary open country. Going from 20 m to 50 m takes output from 15,591 to 25,020 kWh a year, 60% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.44 m/s15,591 kWh44 years
30 m5.97 m/s19,497 kWh35 years
40 m6.38 m/s22,539 kWh31 years
50 m6.72 m/s25,020 kWh28 years

Counties around Jefferson County

3 of the 6 closest counties are windier at turbine height; the windiest, Keokuk County, averages 6.03 m/s.

Sun versus wind in Jefferson County

Jefferson County gets 4.03 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,177 kWh a year; one kW of the turbine above makes 1,948. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.