TurbinePayback

Wind Turbine Payback in Jefferson County, OR

Wind turbine payback in Jefferson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Jefferson County, OR averages 3.93 m/s (8.8 mph). A 10 kW turbine there would make about 6,231 kWh a year, worth $963 at OR's 15.46¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Jefferson County

A home turbine is not worth buying for savings in Jefferson County unless your spot is far windier than the county average, 7.8 m/s at the hub against 3.93 m/s here. Per kW, solar panels would make about 1,247 kWh a year here against the turbine's 623, so get a solar quote first.

What would have to change

Against the rest of OR

Jefferson County is the 2,112th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in OR is Gilliam County at 5.48 m/s, payback 41 years.

Month by month in Jefferson County

December is the strongest month here, at 4.59 m/s and about 842 kWh. August is the weakest, 3.11 m/s and 249 kWh, so the best month makes 3.4 times the worst. November to March brings in 59% of the year's output in Jefferson County.

MonthWind at 30 mOutputWorth
January4.59 m/s837 kWh$129
February4.42 m/s679 kWh$105
March4.41 m/s748 kWh$116
April4.05 m/s561 kWh$87
May3.72 m/s447 kWh$69
June3.59 m/s386 kWh$60
July3.17 m/s266 kWh$41
August3.11 m/s249 kWh$38
September3.29 m/s292 kWh$45
October3.83 m/s488 kWh$75
November4.44 m/s736 kWh$114
December4.59 m/s842 kWh$130

What a taller tower would buy

Measured at 10 m the wind in Jefferson County averages 2.99 m/s; at 50 m it is 4.47 m/s. That gives a shear exponent of 0.250, typical of ordinary open country. Going from 20 m to 50 m takes output from 4,549 to 9,160 kWh a year, 101% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.55 m/s4,549 kWhover 100 years
30 m3.93 m/s6,251 kWhover 100 years
40 m4.23 m/s7,773 kWh83 years
50 m4.47 m/s9,160 kWh71 years

Counties around Jefferson County

4 of the 6 closest counties are windier at turbine height; the windiest, Crook County, averages 4.99 m/s.

Sun versus wind in Jefferson County

Jefferson County gets 4.27 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,247 kWh a year; one kW of the turbine above makes 623. Kilowatt for kilowatt, panels make 2.0 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.