TurbinePayback

Wind Turbine Payback in Jefferson County, TX

Wind turbine payback in Jefferson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Jefferson County, TX averages 4.32 m/s (9.7 mph). A 10 kW turbine there would make about 8,289 kWh a year, worth $1,329 at TX's 16.03¢/kWh. Against an installed cost of about $100,000, that is a payback of 75 years, and the turbine is built to last about 20.

What to do in Jefferson County

A home turbine is not worth buying for savings in Jefferson County unless your spot is far windier than the county average, 7.6 m/s at the hub against 4.32 m/s here. Per kW, solar panels would make about 1,381 kWh a year here against the turbine's 829, so get a solar quote first.

What would have to change

Against the rest of TX

Jefferson County is the 1,882nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TX is Dallam County at 6.82 m/s, payback 24 years.

Month by month in Jefferson County

April is the strongest month here, at 4.99 m/s and about 1,026 kWh. August is the weakest, 3.43 m/s and 344 kWh, so the best month makes 3.0 times the worst. November to March brings in 51% of the year's output in Jefferson County.

MonthWind at 30 mOutputWorth
January4.66 m/s876 kWh$140
February4.79 m/s854 kWh$137
March4.81 m/s959 kWh$154
April4.99 m/s1,026 kWh$164
May4.58 m/s835 kWh$134
June3.86 m/s486 kWh$78
July3.50 m/s369 kWh$59
August3.43 m/s344 kWh$55
September3.76 m/s447 kWh$72
October4.24 m/s666 kWh$107
November4.51 m/s770 kWh$123
December4.70 m/s899 kWh$144

What a taller tower would buy

Measured at 10 m the wind in Jefferson County averages 3.08 m/s; at 50 m it is 5.05 m/s. That gives a shear exponent of 0.307, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 5,669 to 12,873 kWh a year, 127% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.81 m/s5,669 kWhover 100 years
30 m4.32 m/s8,272 kWh75 years
40 m4.72 m/s10,670 kWh59 years
50 m5.05 m/s12,873 kWh49 years

Counties around Jefferson County

5 of the 6 closest counties are windier at turbine height; the windiest, Chambers County, averages 5.76 m/s.

Sun versus wind in Jefferson County

Jefferson County gets 4.73 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,381 kWh a year; one kW of the turbine above makes 829. Kilowatt for kilowatt, panels make 1.7 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.