Wind Turbine Payback in Jefferson Davis County, MS

Wind turbine payback in Jefferson Davis County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Jefferson Davis County, MS averages 2.95 m/s (6.6 mph). A 10 kW turbine there would make about 2,455 kWh a year, worth $370 at MS's 15.06¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Jefferson Davis County

A home turbine is not worth buying for savings in Jefferson Davis County unless your spot is far windier than the county average, 7.9 m/s at the hub against 2.95 m/s here. Per kW, solar panels would make about 1,349 kWh a year here against the turbine's 246, so get a solar quote first.

What would have to change

Against the rest of MS

Jefferson Davis County is the 3,083rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MS is DeSoto County at 5.13 m/s, payback 50 years.

Month by month in Jefferson Davis County

March is the strongest month here, at 3.34 m/s and about 315 kWh. July is the weakest, 2.30 m/s and 82 kWh, so the best month makes 3.8 times the worst. November to March brings in 55% of the year's output in Jefferson Davis County.

MonthWind at 30 mOutputWorth
January3.24 m/s285 kWh$43
February3.31 m/s278 kWh$42
March3.34 m/s315 kWh$47
April3.32 m/s300 kWh$45
May2.90 m/s195 kWh$29
June2.48 m/s108 kWh$16
July2.30 m/s82 kWh$12
August2.38 m/s95 kWh$14
September2.72 m/s151 kWh$23
October3.02 m/s226 kWh$34
November3.20 m/s265 kWh$40
December3.21 m/s278 kWh$42

What a taller tower would buy

Measured at 10 m the wind in Jefferson Davis County averages 1.71 m/s; at 50 m it is 3.8 m/s. That gives a shear exponent of 0.496, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,176 to 5,614 kWh a year, 377% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.41 m/s1,176 kWhover 100 years
30 m2.95 m/s2,454 kWhover 100 years
40 m3.4 m/s3,949 kWhover 100 years
50 m3.8 m/s5,614 kWhover 100 years

Counties around Jefferson Davis County

1 of the 6 closest counties is windier at turbine height; the windiest, Simpson County, averages 3.12 m/s.

Sun versus wind in Jefferson Davis County

Jefferson Davis County gets 4.62 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,349 kWh a year; one kW of the turbine above makes 246. Kilowatt for kilowatt, panels make 5.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.