Wind Turbine Payback in Jones County, NC

Wind turbine payback in Jones County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Jones County, NC averages 4.79 m/s (10.7 mph). A 10 kW turbine there would make about 11,147 kWh a year, worth $1,665 at NC's 14.94¢/kWh. Against an installed cost of about $100,000, that is a payback of 60 years, and the turbine is built to last about 20.

What to do in Jones County

A home turbine is not worth buying for savings in Jones County unless your spot is far windier than the county average, 7.9 m/s at the hub against 4.79 m/s here. Per kW, solar panels would make about 1,305 kWh a year here against the turbine's 1,115, so get a solar quote first.

What would have to change

Against the rest of NC

Jones County is the 1,566th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NC is Dare County at 6.91 m/s, payback 25 years.

Month by month in Jones County

March is the strongest month here, at 5.49 m/s and about 1,357 kWh. August is the weakest, 3.78 m/s and 468 kWh, so the best month makes 2.9 times the worst. November to March brings in 51% of the year's output in Jones County.

MonthWind at 30 mOutputWorth
January5.19 m/s1,173 kWh$175
February5.41 m/s1,182 kWh$177
March5.49 m/s1,357 kWh$203
April5.55 m/s1,349 kWh$202
May4.81 m/s959 kWh$143
June4.23 m/s640 kWh$96
July4.06 m/s583 kWh$87
August3.78 m/s468 kWh$70
September4.44 m/s738 kWh$110
October4.66 m/s874 kWh$131
November4.91 m/s980 kWh$146
December4.98 m/s1,052 kWh$157

What a taller tower would buy

Measured at 10 m the wind in Jones County averages 3.55 m/s; at 50 m it is 5.5 m/s. That gives a shear exponent of 0.272, typical of ordinary open country. Going from 20 m to 50 m takes output from 8,102 to 16,037 kWh a year, 98% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.29 m/s8,102 kWh83 years
30 m4.79 m/s11,124 kWh60 years
40 m5.18 m/s13,741 kWh49 years
50 m5.5 m/s16,037 kWh42 years

Counties around Jones County

4 of the 6 closest counties are windier at turbine height; the windiest, Greene County, averages 4.94 m/s.

Sun versus wind in Jones County

Jones County gets 4.47 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,305 kWh a year; one kW of the turbine above makes 1,115. Kilowatt for kilowatt, panels make 1.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.