TurbinePayback

Wind Turbine Payback in La Crosse County, WI

Wind turbine payback in La Crosse County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in La Crosse County, WI averages 6.03 m/s (13.5 mph). A 10 kW turbine there would make about 19,926 kWh a year, worth $3,796 at WI's 19.05¢/kWh. Against an installed cost of about $100,000, that is a payback of 26 years, and the turbine is built to last about 20.

What to do in La Crosse County

A home turbine is not worth buying for savings in La Crosse County unless your spot is far windier than the county average, 6.9 m/s at the hub against 6.03 m/s here. Per kW, solar panels would make about 1,136 kWh a year here against the turbine's 1,993, so get a solar quote first.

What would have to change

Against the rest of WI

La Crosse County is the 791st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WI is Manitowoc County at 7.32 m/s, payback 18 years.

Month by month in La Crosse County

April is the strongest month here, at 6.77 m/s and about 2,089 kWh. August is the weakest, 4.94 m/s and 1,032 kWh, so the best month makes 2.0 times the worst. November to March brings in 47% of the year's output in La Crosse County.

MonthWind at 30 mOutputWorth
January6.47 m/s1,969 kWh$375
February6.60 m/s1,855 kWh$353
March6.44 m/s1,953 kWh$372
April6.77 m/s2,089 kWh$398
May6.10 m/s1,739 kWh$331
June5.55 m/s1,348 kWh$257
July4.99 m/s1,057 kWh$201
August4.94 m/s1,032 kWh$197
September5.83 m/s1,514 kWh$288
October6.34 m/s1,885 kWh$359
November6.33 m/s1,819 kWh$347
December6.13 m/s1,756 kWh$335

What a taller tower would buy

Measured at 10 m the wind in La Crosse County averages 4.74 m/s; at 50 m it is 6.75 m/s. That gives a shear exponent of 0.220, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,165 to 25,239 kWh a year, 56% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.52 m/s16,165 kWh33 years
30 m6.03 m/s19,945 kWh26 years
40 m6.43 m/s22,866 kWh23 years
50 m6.75 m/s25,239 kWh21 years

Counties around La Crosse County

4 of the 6 closest counties are windier at turbine height; the windiest, Winona County, averages 6.17 m/s.

Sun versus wind in La Crosse County

La Crosse County gets 3.89 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,136 kWh a year; one kW of the turbine above makes 1,993. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.