TurbinePayback

Wind Turbine Payback in Le Sueur County, MN

Wind turbine payback in Le Sueur County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Le Sueur County, MN averages 6.23 m/s (13.9 mph). A 10 kW turbine there would make about 21,410 kWh a year, worth $3,520 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 28 years, and the turbine is built to last about 20.

What to do in Le Sueur County

A home turbine is not worth buying for savings in Le Sueur County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.23 m/s here. Per kW, solar panels would make about 1,127 kWh a year here against the turbine's 2,141, so get a solar quote first.

What would have to change

Against the rest of MN

Le Sueur County is the 550th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Le Sueur County

April is the strongest month here, at 6.89 m/s and about 2,155 kWh. August is the weakest, 5.20 m/s and 1,178 kWh, so the best month makes 1.8 times the worst. November to March brings in 45% of the year's output in Le Sueur County.

MonthWind at 30 mOutputWorth
January6.53 m/s2,005 kWh$330
February6.55 m/s1,826 kWh$300
March6.58 m/s2,039 kWh$335
April6.89 m/s2,155 kWh$354
May6.39 m/s1,921 kWh$316
June5.81 m/s1,505 kWh$247
July5.20 m/s1,183 kWh$194
August5.20 m/s1,178 kWh$194
September6.22 m/s1,756 kWh$289
October6.56 m/s2,027 kWh$333
November6.54 m/s1,946 kWh$320
December6.31 m/s1,870 kWh$307

What a taller tower would buy

Measured at 10 m the wind in Le Sueur County averages 4.9 m/s; at 50 m it is 6.97 m/s. That gives a shear exponent of 0.219, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,512 to 26,828 kWh a year, 53% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.7 m/s17,512 kWh35 years
30 m6.23 m/s21,427 kWh28 years
40 m6.64 m/s24,418 kWh25 years
50 m6.97 m/s26,828 kWh23 years

Counties around Le Sueur County

4 of the 6 closest counties are windier at turbine height; the windiest, Waseca County, averages 6.38 m/s.

Sun versus wind in Le Sueur County

Le Sueur County gets 3.86 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,127 kWh a year; one kW of the turbine above makes 2,141. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.