No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Linn County, OR averages 2.9 m/s (6.5 mph). A 10 kW turbine there would make about 2,315 kWh a year, worth $358 at OR's 15.46¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Linn County

A home turbine is not worth buying for savings in Linn County unless your spot is far windier than the county average, 7.8 m/s at the hub against 2.9 m/s here. Per kW, solar panels would make about 1,145 kWh a year here against the turbine's 232, so get a solar quote first.

What would have to change

Against the rest of OR

Linn County is the 3,106th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in OR is Gilliam County at 5.48 m/s, payback 41 years.

Month by month in Linn County

December is the strongest month here, at 3.66 m/s and about 424 kWh. July is the weakest, 2.27 m/s and 79 kWh, so the best month makes 5.4 times the worst. November to March brings in 66% of the year's output in Linn County.

MonthWind at 30 mOutputWorth
January3.60 m/s403 kWh$62
February3.23 m/s255 kWh$39
March3.15 m/s262 kWh$41
April2.80 m/s167 kWh$26
May2.45 m/s107 kWh$17
June2.41 m/s97 kWh$15
July2.27 m/s79 kWh$12
August2.32 m/s86 kWh$13
September2.55 m/s120 kWh$19
October2.93 m/s203 kWh$31
November3.47 m/s347 kWh$54
December3.66 m/s424 kWh$66

What a taller tower would buy

Measured at 10 m the wind in Linn County averages 1.87 m/s; at 50 m it is 3.56 m/s. That gives a shear exponent of 0.400, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,285 to 4,570 kWh a year, 256% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.47 m/s1,285 kWhover 100 years
30 m2.9 m/s2,320 kWhover 100 years
40 m3.26 m/s3,422 kWhover 100 years
50 m3.56 m/s4,570 kWhover 100 years

Counties around Linn County

5 of the 6 closest counties are windier at turbine height; the windiest, Polk County, averages 3.46 m/s.

Sun versus wind in Linn County

Linn County gets 3.92 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,145 kWh a year; one kW of the turbine above makes 232. Kilowatt for kilowatt, panels make 4.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.