No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Lynn County, TX averages 6.23 m/s (13.9 mph). A 10 kW turbine there would make about 21,410 kWh a year, worth $3,432 at TX's 16.03¢/kWh. Against an installed cost of about $100,000, that is a payback of 29 years, and the turbine is built to last about 20.

What to do in Lynn County

A home turbine is not worth buying for savings in Lynn County unless your spot is far windier than the county average, 7.6 m/s at the hub against 6.23 m/s here. Per kW, solar panels would make about 1,562 kWh a year here against the turbine's 2,141, so get a solar quote first.

What would have to change

Against the rest of TX

Lynn County is the 550th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TX is Dallam County at 6.82 m/s, payback 24 years.

Month by month in Lynn County

April is the strongest month here, at 7.18 m/s and about 2,328 kWh. August is the weakest, 5.34 m/s and 1,263 kWh, so the best month makes 1.8 times the worst. November to March brings in 45% of the year's output in Lynn County.

MonthWind at 30 mOutputWorth
January6.32 m/s1,873 kWh$300
February6.51 m/s1,803 kWh$289
March6.78 m/s2,162 kWh$347
April7.18 m/s2,328 kWh$373
May6.58 m/s2,035 kWh$326
June6.33 m/s1,818 kWh$291
July5.54 m/s1,388 kWh$222
August5.34 m/s1,263 kWh$202
September5.44 m/s1,285 kWh$206
October6.11 m/s1,744 kWh$280
November6.33 m/s1,818 kWh$291
December6.36 m/s1,901 kWh$305

What a taller tower would buy

Measured at 10 m the wind in Lynn County averages 4.86 m/s; at 50 m it is 6.99 m/s. That gives a shear exponent of 0.226, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,364 to 26,971 kWh a year, 55% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.68 m/s17,364 kWh36 years
30 m6.23 m/s21,394 kWh29 years
40 m6.65 m/s24,481 kWh26 years
50 m6.99 m/s26,971 kWh23 years

Counties around Lynn County

3 of the 6 closest counties are windier at turbine height; the windiest, Lubbock County, averages 6.3 m/s.

Sun versus wind in Lynn County

Lynn County gets 5.35 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,562 kWh a year; one kW of the turbine above makes 2,141. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.